Data centres support services people use every day, including banking, communications, health systems, utilities and emergency services. Artificial intelligence (AI) data centres use specialized computer chips to process large amounts of information quickly. They can use more electricity and produce more heat than conventional data centres, so power, cooling and backup systems are important parts of project planning and review.
Environmental rules and safeguards
Nova Scotia reviews regulated activities that could affect air, water, land or human health. Reviews are based on science, evidence and the details of each project. A project may need one or more approvals with conditions designed to protect people and the environment.
Activities that may be regulated include:
- power generation
- water withdrawal and storage
- fuel and chemical storage
- hazardous materials
- air emissions and greenhouse gas emissions
- industrial noise
- solid waste, sewage, wastewater and stormwater management
- changes to wetlands or watercourses
- erosion and sediment control
How environmental regulation works
The province has a range of regulatory tools to mitigate the possible impacts of regulated activities.
Environmental assessments
An environmental assessment is a planning and decision-making process for certain types of projects. It identifies potential benefits and environmental effects and explains how those effects would be avoided or managed.
Learn more about the environmental assessment process.
Industrial approvals
Industrial approvals, sometimes called operating approvals, allow certain regulated projects or activities to be built, operated or reclaimed. Approval holders must follow the conditions in the approval.
Other provincial approvals may be required for activities such as:
- withdrawing water
- altering a wetland or watercourse
- storing petroleum
- handling dangerous goods
Review the Activities Designation Regulations.
Activities commonly associated with data centres
The approvals a data centre needs depend on its design, size, location and proposed activities.
Water withdrawal
An approval is required to withdraw more than 23,000 litres of surface water or groundwater a day. Storing 25,000 cubic metres or more of water also requires approval. These reviews help protect and manage Nova Scotia's water resources.
On-site power generation
A thermal power plant with a total rated thermal input capacity of 25 megawatts or more requires environmental approval. This can include generation using diesel, natural gas or other fuels.
Fuel and chemical storage
Petroleum storage tanks and associated piping are regulated. Approval may also be required for systems that store more than 2,000 litres of liquid chemicals or 2,000 kilograms of solid chemicals.
Wetlands and watercourses
Work that changes a wetland, watercourse or water resource may require an approval or notification.
Other safeguards
Approval conditions can address air emissions, industrial noise, spill prevention and response, monitoring, reporting, operating requirements and site-specific risks.
Electricity use and rates
Data centres need a reliable supply of electricity. New customers are responsible for the additional costs they create for the electricity system, including infrastructure or service requirements associated with their project.
The provincial energy regulator reviews utility applications, customer classifications and rate structures through public processes. This helps make sure costs are assigned fairly and existing ratepayers are protected.
A large electricity customer may also help spread some fixed system costs across a broader customer base. Any potential effect on rates would depend on the project, required infrastructure, agreements and regulatory decisions.
Proposed EverWind AI data centre at Point Tupper
EverWind has proposed an AI data centre at Point Tupper. The information in this section reflects the proposal and applications under review. An application does not mean an approval has been granted.
Backup power
EverWind has applied for an industrial approval for a proposed backup power generator. The Department of Environment and Climate Change reviews potential effects such as air emissions, noise, fuel storage and wastewater. If an approval is issued, it can include site-specific conditions for environmental protection, monitoring and reporting. The department can inspect operations and enforce requirements under the Environment Act.
Proposed water use
The proposal identifies the Landrie Lake Water Utility as the water source. The utility has an existing approval to withdraw up to 34 million litres a day and currently withdraws an average of less than 9 million litres a day.
EverWind has proposed using about:
- 100,000 litres a day during phase 1
- 500,000 litres a day when the data campus is complete
At 500,000 litres a day, the proposed use would be about 1.47% of the utility's approved maximum daily withdrawal. The utility must report any non-compliance with its approval to the department immediately.
Interruptible electricity service
The proposed data centre is expected to use interruptible electricity service. Under this type of service, electricity use can be reduced or temporarily interrupted during periods of high demand or stress on the grid. This helps the electricity system prioritize essential demand during peak periods.
Requirements for major data centres
Any company proposing a major data centre in Nova Scotia must meet applicable laws, standards, reviews and approval conditions. Government has also identified the following expectations for major projects:
- meet or exceed applicable federal standards
- protect water and the environment, including using closed-loop cooling and meeting strict requirements for water use, noise and emissions
- protect electricity ratepayers
- provide lasting benefits for Nova Scotians, such as jobs, training and opportunities for local businesses
- work with the host municipality on meaningful local benefits
- provide a direct financial return to Nova Scotians beyond normal taxes, including support for provincial energy and economic priorities