|
Schedule 9A
Regulations made under the Environment Act
|
|
Offence
|
Section
|
Out of Court
Settlement
|
|
Activities Designation Regulations
|
1
|
Failing to obtain approval for designated activity
|
3(1)
|
$697.50
|
2
|
Modifying or extending (specify) designated activity without
approval
|
3(2)
|
$697.50
|
|
Air Quality Regulations
|
1
|
Carrying out, causing, permitting or being responsible for
(specify) burning designated material without written
authorization
|
4(1)
|
$697.50
|
2
|
Causing or permitting (specify) motor gasoline to leave refinery
when vapour pressure exceeds volatility limit
|
5(3)(a)
|
$697.50
|
3
|
Person who imports motor gasoline causing or permitting
(specify) transfer of possession of motor gasoline when vapour
pressure exceeds volatility limits
|
5(3)(b)(i)
|
$697.50
|
4
|
Person who imports motor gasoline causing or permitting
(specify) transfer of motor gasoline from one container to another
when vapour pressure exceeds volatility limits
|
5(3)(b)(ii)
|
$697.50
|
5
|
Failing to submit report on or before March 31 on sulphur throughput
|
6(2)
|
$697.50
|
6
|
Failing to submit plan on or before March 31 indicating how excess emissions will be recovered
|
6(5)(b)
|
$697.50
|
|
Approval and Notification Procedures Regulations
|
1
|
Failing to apply for approval on form required
|
4(1)
|
$467.50
|
2
|
Failing to apply for approval in manner required
|
4(2)
|
$697.50
|
3
|
Failing to keep financial security in effect for abandoned site
|
13(2)
|
$697.50
|
4
|
Failing to notify Minister at least 60 days before abandoning site
|
20(1)
|
$467.50
|
5
|
Failing to comply with requirement after abandoning site
(specify)
|
20(2)
|
$582.50
|
6
|
Failing to rehabilitate site
|
21(1)
|
$697.50
|
7
|
Failing to submit rehabilitation plan at least 60 days before
abandonment
|
21(2)
|
$697.50
|
8
|
Providing notification for activity not designated
|
22(1)
|
$697.50
|
9
|
Commencing activity before obtaining notification receipt
|
22(2)
|
$467.50
|
10
|
Carrying out activity without notification receipt on site
|
22(3)
|
$812.50
|
11
|
Failing to produce notification receipt on demand for activity
being carried out
|
22(3)
|
$812.50
|
12
|
Carrying out activity outside time period indicated on notification
receipt
|
22(4)
|
$467.50
|
13
|
Failing to provide new notification before making substantial
change to activity
|
22(7)
|
$467.50
|
14
|
Failing to obtain Type A approval before commencing or
continuing activity for which notification requirements not met
|
22(8)
|
$697.50
|
15
|
Carrying on activity after notification cancelled
|
22(10)(a)
|
$1157.50
|
16
|
Carrying on activity after notification deemed cancelled
|
22(10)(b)
|
$1157.50
|
17
|
Failing to provide notification on form required
|
24(2)
|
$467.50
|
18
|
Failing to provide notification in manner required
|
24(3)
|
$697.50
|
19
|
Failing to provide information requested by inspector for
compliance audit
|
26(1)
|
$697.50
|
20
|
Failing to provide notice to Department of completion of activity
as required by inspector
|
26(2)
|
$697.50
|
21
|
Failing to undertake compliance monitoring as required by
approval
|
28(1)
|
$697.50
|
22
|
Failing to undertake compliance monitoring as required by Act,
regulation or standard (specify)
|
28(1)
|
$697.50
|
23
|
Failing to submit results of compliance monitoring to Department
as required
|
28(2)
|
$467.50
|
24
|
Failing to report release of substance in excess of level
authorized
|
28(3)
|
$697.50
|
|
Asbestos Waste Management Regulations
|
1
|
Storing asbestos waste produced by third party at unapproved
storage facility
|
5
|
$697.50
|
2
|
Failing to comply with codes of practice respecting the handling,
storage and transport of asbestos waste
|
6
|
$697.50
|
3
|
Failing to wear protective clothing and equipment while
handling, storing, burying or disposing of asbestos waste
|
7
|
$697.50
|
4
|
Permitting asbestos fibres or asbestos dust to become airborne
|
8
|
$697.50
|
5
|
Failing to wet asbestos waste before transporting, handling or
storing
|
9
|
$697.50
|
6
|
Failing to package asbestos waste as prescribed before
transporting, handling or storing
|
9
|
$697.50
|
7
|
Transporting, storing or handling packages or containers of
asbestos waste which contain punctures, tears or leaks
|
10(1)
|
$697.50
|
8
|
Transporting, storing or handling asbestos waste within container
or vehicle contaminated by asbestos waste
|
10(2)
|
$697.50
|
9
|
Failing to immediately repair or replace damaged package or
container containing asbestos waste
|
11(a)
|
$697.50
|
10
|
Failing to repackage asbestos waste after package or container is
damaged
|
11(b)
|
$697.50
|
11
|
Offering for transport, transporting, or accepting asbestos waste
which is not covered by shipping document
|
12
|
$697.50
|
12
|
Transporting asbestos waste in vehicle which is not completely
enclosed
|
13(a)
|
$697.50
|
13
|
Transporting asbestos waste in open vehicle in which waste is not
completely covered and secured
|
13(b)
|
$697.50
|
14
|
Transporting asbestos waste in bulk without prior authorization
from administrator
|
14(a)
|
$697.50
|
15
|
Transporting asbestos waste in bulk without receiving approval
from receiver
|
14(b)
|
$697.50
|
16
|
Transporting asbestos waste in vehicle without equipment
required by the regulations
|
15
|
$697.50
|
17
|
Transporting asbestos waste in compaction type waste haulage
vehicle
|
16(a)
|
$697.50
|
18
|
Transporting asbestos waste in vehicle in which other cargo is
being transported
|
16(b)
|
$697.50
|
19
|
Transporting asbestos waste to transfer station
|
17
|
$697.50
|
20
|
Failing to transport asbestos waste directly to approved disposal
site or approved asbestos waste storage facility before
transporting asbestos waste
|
18(a)
|
$697.50
|
21
|
Failing to obtain prior approval from disposal site or storage
facility before transporting asbestos waste
|
18(b)
|
$697.50
|
22
|
Disposing of asbestos waste contrary to the regulations
|
19
|
$697.50
|
23
|
Burying asbestos in method contrary to the regulations
|
20
|
$697.50
|
24
|
Failing to cover active asbestos waste disposal site as required by
the regulations
|
21(a)
|
$697.50
|
25
|
Failing to cover abandoned or discontinued asbestos waste
disposal site as required by the regulations
|
21(b)
|
$697.50
|
26
|
Failing to inspect the actively used portion of asbestos waste
disposal site on daily basis
|
22(a)
|
$697.50
|
27
|
Failing to inspect asbestos waste disposal site on monthly basis
|
22(b)
|
$697.50
|
28
|
Failing to mark abandoned or discontinued asbestos waste
disposal site with permanent marker
|
23(1)(a)
|
$697.50
|
29
|
Failing to maintain final cover of 125 cm at abandoned or
discontinued asbestos waste disposal site
|
23(1)(b)
|
$697.50
|
30
|
Failing to file annual report on or before February 1st on asbestos
waste disposal site
|
23(1)(c)
|
$467.50
|
|
Contaminated Sites Regulations
|
1
|
Failing to file reporting system document in electronic form and
manner set out in Ministerial protocol
|
4(3)
|
$582.50
|
2
|
Holding themself out as site professional without meeting
prescribed qualifications
|
5(2)
|
$697.50
|
3
|
Acting as site professional without required insurance coverage
|
6(1)
|
$697.50
|
4
|
Failing to immediately report presence of free product to
Minister
|
8(1)(a)
|
$697.50
|
5
|
Failing to immediately report presence of free product to site
owner
|
8(1)(b)
|
$697.50
|
6
|
Failing to immediately report presence of free product to person
directly affected
|
8(1)(c)
|
$697.50
|
7
|
Failing to provide to Minister within required time written notice
of presence of free product
|
8(2)
|
$582.50
|
8
|
Failing to provide to Minister within required time written notice
of contaminant that exceeds Ministerial protocol
|
9(a)
|
$582.50
|
9
|
Failing to provide to site owner within required time written
notice of contaminant that exceeds Ministerial protocol
|
9(b)
|
$582.50
|
10
|
Failing to provide to person directly affected within required time
written notice of contaminant that exceeds Ministerial protocol
|
9(c)
|
$582.50
|
11
|
Failing to include all required information on notice of
contaminant (specify)
|
10(1)
|
$295.00
|
12
|
Failing to use form approved by Minister for notice of
contaminant
|
10(1)
|
$295.00
|
13
|
Failing to have notice signed by each owner of contaminated site
|
10(2)(a)
|
$295.00
|
14
|
Failing to sign notice
|
10(2)(b)
|
$295.00
|
15
|
Failing to take all reasonable measures to prevent, reduce or
remedy adverse effects of contaminant (specify)
|
11(a)(i)
|
$697.50
|
16
|
Failing to take all reasonable measures to remove or dispose of
contaminant to minimize adverse effects
|
11(a)(ii)
|
$697.50
|
17
|
Failing to remediate contaminated site in accordance with
regulations (specify)
|
11(a)(iii)
|
$697.50
|
18
|
Failing to take measure required by inspector or administrator
(specify)
|
11(b)
|
$697.50
|
19
|
Failing to carry out limited remediation or full property
remediation (specify)
|
12
|
$697.50
|
20
|
Failing to ensure completion of environmental site assessment in
accordance with Ministerial protocol (specify)
|
13(1)(a)
|
$582.50
|
21
|
Failing to file environmental site assessment with Minister within
required time
|
13(1)(a)
|
$582.50
|
22
|
Failing to ensure completion of remedial action plan report in
accordance with Ministerial protocol (specify)
|
13(1)(b)
|
$582.50
|
23
|
Failing to ensure completion of confirmation report in
accordance with Ministerial protocol or regulations (specify)
|
13(1)(c)
|
$582.50
|
24
|
Failing to ensure record of site condition is complete and filed
(specify)
|
13(1)(d)
|
$582.50
|
25
|
Failing to ensure all limited remediation work is conducted by or
under supervision of site professional
|
13(1)(e)
|
$697.50
|
26
|
Failing to complete limited remediation within required time
(specify)
|
13(2)
|
$697.50
|
27
|
Submitting declaration of property condition for contaminated
site addressed by limited remediation
|
13(3)
|
$697.50
|
28
|
Failing to include all required information on record of site
condition (specify)
|
14(1)
|
$295.00
|
29
|
Failing to use form approved by Minister for record of site
condition
|
14(1)
|
$295.00
|
30
|
Failing to have record of site condition signed by each owner of
remediated parcel of land
|
14(2)(a)
|
$295.00
|
31
|
Failing to have record of site condition signed by person
responsible for contaminated site
|
14(2)(b)
|
$295.00
|
32
|
Failing to have record of site condition signed or certified as
accurate by site professional (specify)
|
14(2)(c)
|
$295.00
|
33
|
Failing to ensure completion of phase 1 environmental site
assessment in accordance with Ministerial protocol (specify)
|
15(1)(a)
|
$582.50
|
34
|
Failing to file phase 1 environmental site assessment with
Minister
|
15(1)(a)
|
$582.50
|
35
|
Failing to ensure completion of phase 2 environmental site
assessment in accordance with Ministerial protocol (specify)
|
15(1)(b)
|
$582.50
|
36
|
Failing to file phase 2 environmental site assessment with
Minister within required time
|
15(1)(b)
|
$582.50
|
37
|
Failing to ensure completion of remedial action plan report in
accordance with Ministerial protocol (specify)
|
15(1)(c)
|
$582.50
|
38
|
Failing to file remedial action plan with Minister
|
15(1)(c)
|
$582.50
|
39
|
Failing to ensure completion of confirmation report in
accordance with Ministerial protocol or regulations (specify)
|
15(1)(d)
|
$582.50
|
40
|
Failing to file confirmation report with Minister
|
15(1)(d)
|
$582.50
|
41
|
Failing to ensure declaration of property condition is complete
(specify)
|
15(1)(e)
|
$582.50
|
42
|
Failing to file declaration of property condition with Minister
|
15(1)(e)
|
$582.50
|
43
|
Failing to ensure full property remediation work is conducted by
or under supervision of site professional
|
15(1)(f)
|
$697.50
|
44
|
Failing to complete full property remediation within required
time
|
15(2)
|
$697.50
|
45
|
Failing to include all required information on declaration of
property condition (specify)
|
16(1)
|
$295.00
|
46
|
Failing to use form approved by Minister for declaration of
property condition
|
16(1)
|
$295.00
|
47
|
Failing to have declaration of property condition signed by each
owner of remediated parcel of land
|
16(2)(a)
|
$295.00
|
48
|
Failing to have declaration of property condition signed by
person responsible for contaminated site
|
16(2)(b)
|
$295.00
|
49
|
Failing to have declaration of property condition signed or
certified as accurate by site professional (specify)
|
16(2)(c)
|
$295.00
|
|
Dangerous Goods Management Regulations
|
1
|
Disposing of PCB waste by burying in landfill or in ground
|
6(1)
|
$697.50
|
2
|
Diluting or adulterating waste dangerous goods without prior
written approval
|
6(2)
|
$697.50
|
3
|
Storing dangerous goods/waste dangerous goods in container
constructed of incompatible materials
|
7(1)
|
$697.50
|
4
|
Using portable container for dangerous goods/waste dangerous
goods which does not meet federal packaging requirements
|
7(2)
|
$467.50
|
5
|
Using steel underground storage tank system to store dangerous
goods/waste dangerous goods which does not comply with
regulations
|
7(3)(a)
|
$697.50
|
6
|
Failing to remove steel underground storage tank system for the
storage of dangerous/waste dangerous goods within 15 years of
installation
|
7(3)(b)
|
$697.50
|
7
|
Failing to remove non-compliance steel under-ground storage
tank system before April 1, 1996
|
7(4)
|
$697.50
|
8
|
Failing to label dangerous goods/waste dangerous goods or
storage containers as required by the regulations
|
7(5)
|
$697.50
|
9
|
Exposing dangerous goods/waste dangerous goods during storage
to incompatible materials
|
7(6)
|
$697.50
|
10
|
Failing to separate incompatible materials with barrier
|
7(7)
|
$697.50
|
11
|
Failing to design, construct and maintain storage facility to
prevent weather impacts on the facility
|
8(1)
|
$697.50
|
12
|
Failing to secure storage facility from public entry
|
8(2)(a)
|
$697.50
|
13
|
Failing to prominently identify storage facility
|
8(2)(b)
|
$697.50
|
14
|
Failing to equip storage facility for emergencies
|
8(2)(c)
|
$697.50
|
15
|
Failing to train employees in proper emergency response
|
8(2)(d)
|
$697.50
|
16
|
[repealed]
|
|
|
17
|
[repealed]
|
|
|
18
|
Storing waste dangerous goods in environmentally sensitive area
in quantities greater than those approved by administrator
|
9(2)
|
$697.50
|
19
|
Failing to provide contingency plans for storage facility
|
10(1)
|
$697.50
|
20
|
Failing to provide full and complete inventory of substances
stored in storage facility as prescribed by the regulations
|
11(1)
|
$697.50
|
21
|
Causing or permitting discharge of dangerous goods/waste
dangerous goods in manner which may cause adverse effect
without prior written approval
|
12
|
$697.50
|
|
Environmental Emergency Regulations
|
1
|
Failing to report unauthorized release
|
6(1)
|
$697.50
|
2
|
Failing to report reportable release
|
6(2)
|
$697.50
|
3
|
Failing to notify Minister
|
7(a)
|
$697.50
|
4
|
Failing to notify owner of land where release occurred
|
7(b)
|
$697.50
|
5
|
Failing to notify directly affected person
|
7(c)
|
$697.50
|
6
|
Failing to submit written report as required by regulations
|
8
|
$697.50
|
7
|
Failing to comply with directive recognizing environmental
emergency area
|
9(a)
|
$697.50
|
8
|
Failing to comply with directive restricting entry into
environmental emergency area
|
9(b)
|
$697.50
|
9
|
Failing to comply with directive restricting vehicle access into
environmental emergency area
|
9(c)
|
$697.50
|
10
|
Failing to comply with directive recognizing unsafe area
|
9(d)
|
$697.50
|
11
|
Failing to comply with directive to construct works
|
9(e)
|
$697.50
|
12
|
Failing to comply with directive to take immediate action
|
9(f)
|
$697.50
|
13
|
Failing to comply with directive to take measures to remediate as
directed
|
9(g)
|
$697.50
|
|
Motive Fuel and Fuel Oil Approval Regulations
|
1
|
Failing to maintain wholesale facility or outlet (specify) in safe
operating condition
|
8(1)
|
$697.50
|
2
|
Permitting vehicle to be used to refuel another vehicle without
permit
|
8(2)
|
$697.50
|
3
|
Failing to keep each fill pipe to each storage facility locked when
not being used
|
8(3)(a)(i)
|
$697.50
|
4
|
Failing to paint each fill pipe to each storage facility in a colour
prescribed by National Fire Code
|
8(3)(a)(ii)
|
$697.50
|
5
|
Failing to tag each fill pipe to each storage facility in accordance
with standards prescribed in National Fire Code
|
8(3)(a)(iii)
|
$697.50
|
6
|
Failing to keep approval holder's outlet in good repair
|
8(3)(b)
|
$697.50
|
7
|
Failing to keep grounds of approval holder's outlet clean and free
of litter
|
8(3)(c)
|
$467.50
|
8
|
Failing to measure and reconcile the petroleum product level
(motive fuel) in underground storage tank as required by the
regulations
|
9(1)(a)
|
$697.50
|
9
|
Failing to measure and reconcile the petroleum product level
(non motive fuel) in underground storage tank as required by the
regulations at least every 14 days
|
9(1)(b)
|
$697.50
|
10
|
Failing to reconcile the water level in underground storage tank
as required by the regulations
|
9(1)(c)
|
$697.50
|
11
|
Failing to reconcile inventory control measurements as required
by the regulations
|
9(2)
|
$697.50
|
12
|
Failing to record the computation of any gain or loss of
petroleum product and include the same information in a monthly
summary of cumulative losses or gains of petroleum product
|
9(3)
|
$467.50
|
13
|
Failing to forthwith notify Department of unexplained loss or
gain of 0.5% or more of inventory in any month
|
9(4)(a)
|
$467.50
|
14
|
Failing to forthwith notify Department of inventory
reconciliations showing 5 or more consecutive days of gains or
losses when petroleum product level is measured daily
|
9(4)(b)
|
$467.50
|
15
|
Failing to forthwith notify Department of inventory
reconciliations showing 18 or more days per month of losses or
gains when petroleum product is measured daily
|
9(4)(c)
|
$467.50
|
16
|
Failing to forthwith notify Department of inventory
reconciliations showing 15 or more days per month of losses or
gains when petroleum product level is measured 6 days a week
|
9(4)(d)
|
$467.50
|
17
|
Failing to forthwith notify Department of water level in bottom
of underground storage tank exceeding 50 mm
|
9(4)(e)
|
$467.50
|
18
|
Failing to measure and reconcile the petroleum product level
(motive fuel) in aboveground storage tank as required by the
regulations
|
10(1)(a)
|
$697.50
|
19
|
Failing to reconcile inventory control measurements as required
by the regulations
|
10(1)(b)
|
$697.50
|
20
|
Failing to record the computation of any gain or loss of
petroleum product and include the same information in a monthly
summary of cumulative losses or gains of petroleum products
|
10(1)(c)
|
$467.50
|
21
|
Failing to measure and reconcile the petroleum product level
(non motive fuel) in aboveground storage tank at least every 14
days
|
10(2)
|
$697.50
|
22
|
Failing to forthwith notify Department of any unexplained loss or
gain of 1.0% or more of inventory in any month
|
10(3)(a)
|
$697.50
|
23
|
Failing to forthwith notify Department of inventory
reconciliations showing 4 or more consecutive weeks of
unexplained petroleum product losses or gains in excess of 1.0%
of inventory for each week
|
10(3)(b)
|
$467.50
|
24
|
Failing to maintain inventory control records or reconciliation
data (specify) at outlet location for 2 years
|
11(1)
|
$467.50
|
25
|
Failing to make computerized inventory reconciliation available
within 48 hours of request
|
11(2)
|
$467.50
|
26
|
Failing to obtain or maintain (specify) records from previous
owner or operator (specify)
|
11(4)
|
$467.50
|
27
|
Delivering, storing or selling (specify) to consumer less than 205
L of motive fuel
|
12
|
$697.50
|
28
|
Smoking within 7.5 m of motive fuel dispensing unit where
motive fuel is being dispensed
|
13(1)
|
$697.50
|
29
|
Operating the engine or motor of vehicle into which motive fuel
is being dispensed
|
13(2)
|
$697.50
|
30
|
Using jumper cables within 7.5 m of motive fuel dispensing unit
|
13(3)
|
$697.50
|
31
|
Dispensing motive fuel into tank of vehicle while engine or
motor of the vehicle is in operation
|
13(4)(a)
|
$697.50
|
32
|
Dispensing motive fuel while person is smoking within 7.5 m of
motive fuel dispensing unit
|
13(4)(b)
|
$697.50
|
33
|
Dispensing motive fuel while person is using jumper cables
within 7.5 m of motive fuel dispensing unit
|
13(4)(c)
|
$697.50
|
34
|
Failing to post no smoking symbol as required by the regulations
|
13(5)
|
$467.50
|
35
|
Failing to post sign as required by the regulations
|
13(5)
|
$467.50
|
36
|
Failing to post the price per litre and grade of motive fuel
|
14(1)
|
$467.50
|
37
|
Offering or giving merchandise without including cost of
merchandise in wholesale price of motive fuel
|
15
|
$1157.50
|
38
|
Failing to furnish debtor with release and discharge of security
document
|
16(3)
|
$1157.50
|
|
On-site Sewage Disposal Systems Regulations
|
1
|
Person other than professional engineer or qualified person
selecting system
|
3(2)
|
$697.50
|
2
|
Person other than professional engineer designing system
|
3(3)
|
$697.50
|
3
|
Failing to alert Department at least 24 hours before beginning
excavation to install system as required
|
4(1)
|
$697.50
|
3A
|
Installer beginning installing system without permission of
qualified person or professional engineer (specify)
|
4(1A)
|
$697.50
|
4
|
Installer failing to install system as required (specify)
|
4(2)
|
$1157.50
|
5
|
Installer failing to inform qualified person or professional
engineer (specify) of change in conditions occurring before or
during installation of system
|
4(3)
|
$697.50
|
6
|
Covering system without permission of qualified person or
professional engineer (specify)
|
5(1)
|
$697.50
|
7
|
Failing to issue certificate of installation
|
6(1)
|
$697.50
|
8
|
Failing to send copy of certificate of installation to Minister
|
6(3)(a)
|
$697.50
|
9
|
Failing to send copy of certificate of installation to local building
official
|
6(3)(b)
|
$697.50
|
10
|
Failing to send copy of certificate of installation to owner of lot
|
6(3)(c)
|
$697.50
|
11
|
Failing to ensure proper function and maintenance of system
|
7
|
$697.50
|
12
|
Failing to advise Department of malfunction of system that has
resulted in release of untreated sewage or partially treated sewage
|
8(1)(a)
|
$697.50
|
13
|
Failing to advise Department of release of untreated sewage to
environment on or from lot
|
8(1)(b)
|
$697.50
|
14
|
Owner failing to ensure system installed to replace
malfunctioning system or to remedy release of sewage (specify)
within 45 days after date of notification
|
8(2)
|
$697.50
|
15
|
Failing to comply with terms and conditions of certificate of
qualification
|
12
|
$697.50
|
16
|
Failing to present certificate of qualification to inspector when
requested
|
13(2)
|
$697.50
|
17
|
Failing to notify Minister of change in address within 14 days of
change
|
15
|
$697.50
|
18
|
Person other than qualified person advertising or claiming to be
qualified person
|
17(1)
|
$697.50
|
19
|
Person other than installer advertising or claiming to be installer
|
18(1)(a)
|
$697.50
|
20
|
Person other than installer installing or modifying (specify)
system
|
18(1)(b)
|
$1157.50
|
21
|
Person other than installer causing system to be installed or
modified (specify)
|
18(1)(c)
|
$697.50
|
22
|
Person other than septic tank cleaner advertising or claiming to
be septic tank cleaner
|
19(1)(a)
|
$697.50
|
23
|
Person other than septic tank cleaner pumping, repairing or
modifying (specify) septic tank, holding tank or vault privy
(specify)
|
19(1)(b)
|
$697.50
|
24
|
Person other than septic tank cleaner causing septic tank, holding
tank or vault privy (specify) to be pumped, repaired or modified
(specify)
|
19(1)(b)
|
$697.50
|
25
|
Person other than septic tank cleaner pumping portable rest room
|
19(1)(c)
|
$697.50
|
26
|
Person other than septic tank cleaner causing portable rest room
to be pumped
|
19(1)(c)
|
$697.50
|
27
|
Person other than septic tank cleaner cleaning system using
pressurized water or air
|
19(1)(d)
|
$697.50
|
28
|
Failing to prepare and submit required documentation regarding
owner of lot to be subdivided to development officer and
Department
|
21(1)(a)
|
$697.50
|
29
|
Failing to prepare and submit required documentation regarding
subdivider to development officer and Department
|
21(1)(b)
|
$697.50
|
30
|
Failing to prepare and submit required documentation regarding
all owners of land abutting lot to be subdivided to development
officer and Department
|
21(1)(c)
|
$697.50
|
31
|
Failing to prepare and submit required proof from owner that
subdivider appointed as agent of owner to development officer
and Department
|
21(1)(d)
|
$697.50
|
32
|
Failing to prepare and submit required plan or sketch of lot to be
subdivided showing all required information to development
officer and Department
|
21(1)(e)
|
$697.50
|
33
|
Failing to prepare and submit required explanation of system to
development officer and Department
|
21(1)(f)
|
$697.50
|
34
|
Failing to submit assessment report including evaluation of
results of soil assessment to Department
|
21(2)(a)
|
$697.50
|
35
|
Failing to submit assessment report including proposed system
selected or designed for lot to Department
|
21(2)(b)
|
$697.50
|
36
|
Failing to submit assessment report including any information
required by Department to Department
|
21(2)(c)
|
$697.50
|
37
|
Subdividing land to construct or install (specify) system without
meeting minimum lot size requirements
|
22(1)
|
$697.50
|
38
|
Subdividing land to create waterfront lot without meeting
minimum lot size requirements
|
22(2)
|
$697.50
|
39
|
Subdividing land to construct or install (specify) system without
meeting required clearance distances
|
22(4)(b)
|
$697.50
|
|
Ozone Layer Protection Regulations
|
1
|
Releasing or permitting release of an ozone-depleting substance
from equipment or any part thereof
|
4(1)(a)
|
$697.50
|
2
|
Releasing or permitting release of an ozone-depleting substance
from fire extinguishing equipment
|
4(1)(b)
|
$697.50
|
3
|
Releasing or permitting release of an ozone-depleting substance
from container used for the supply, recovery, transport or storage
(specify) of an ozone-depleting substance
|
4(1)(c)
|
$697.50
|
4
|
Releasing or permitting release of an ozone-depleting substance
from ozone-depleting substance recovery, recycling or
reclamation system (specify)
|
4(1)(d)
|
$697.50
|
5
|
Disposing of equipment or fire extinguishing equipment (specify)
without recovering the ozone-depleting substance
|
4(3)
|
$697.50
|
6
|
Servicing, installing or dismantling (specify) equipment which
contains ozone-depleting substance without taking approved
environmental awareness course
|
5(1)(a)
|
$697.50
|
7
|
Reclaiming, recovering, recycling or reusing (specify) an ozone-depleting substance without taking approved environmental
awareness course
|
5(1)(b)
|
$697.50
|
8
|
Failing to recover and reuse, recycle, reclaim or store an ozone-depleting substance which results in release of the ozone-depleting substance
|
5(2)
|
$697.50
|
9
|
Recharging or adding ozone-depleting substance to equipment
without conducting leak test
|
5(3)(a)
|
$697.50
|
10
|
Recharging or adding ozone-depleting substance to leaking
equipment without repairing leak
|
5(3)(b)
|
$697.50
|
11
|
Importing, manufacturing, installing, offering for sale, selling or
buying fire extinguishing equipment containing ozone-depleting
potential greater than 0.05
|
6(1)
|
$697.50
|
12
|
Importing, manufacturing, offering for sale, selling, supplying or
leasing pressurized container containing 10 kg or less of ozone-depleting substance listed in Schedule "A"
|
7(1)
|
$697.50
|
13
|
Offering for sale, selling, supplying or leasing an ozone-depleting
substance in disposable container for charging equipment or fire
extinguishing equipment
|
7(4)
|
$697.50
|
14
|
Selling, supplying or leasing an ozone-depleting substance for the
purpose of servicing equipment to individual who has not
completed approved environmental awareness course
|
8(1)(a)
|
$697.50
|
15
|
Failing to maintain sales records for ozone-depleting substances
|
8(1)(b)
|
$467.50
|
16
|
Installing equipment that does not contain label indicating the
type of ozone-depleting substance and oil it contains
|
9(a)
|
$697.50
|
17
|
Servicing equipment with ozone-depleting substance or oil that is
different from substance indicated on original label
|
9(b)
|
$697.50
|
18
|
Manufacturing, importing, offering for sale, selling, supplying,
leasing or applying (specify) flexible or rigid insulation (specify)
which uses ozone-depleting substance listed in Schedule "A" as a
foaming agent
|
10(1)
|
$697.50
|
19
|
Importing, manufacturing, offering for sale, selling, supplying or
leasing (specify) packaging or wrapping that contains ozone-depleting substance listed in Schedule "A"
|
11
|
$697.50
|
|
Pesticide Regulations
|
1
|
Applying commercial class/restricted class pesticide (specify)
without certificate of qualification
|
6(1)
|
$697.50
|
2
|
Selling or storing commercial class/restricted class pesticide
(specify) without certificate of qualification
|
6(2)
|
$697.50
|
3
|
Transferring certificate of qualification contrary to the
regulations
|
8(6)
|
$697.50
|
4
|
Applying for certificate of qualification by a person who is under
18 years old
|
8(7)
|
$352.50
|
5
|
Supervising non-certified applicator contrary to the regulations
(private applicator)
|
9(1)
|
$467.50
|
6
|
Supervising non-certified applicator contrary to the regulations
(commercial applicator)
|
9(2)
|
$467.50
|
7
|
Supervising non-certified applicator for more than one 30 day
period (commercial applicator)
|
9(3)
|
$467.50
|
8
|
Employing person who does not hold valid certificate of
qualification
|
10(a)
|
$697.50
|
9
|
Selling commercial class/restricted class pesticide (specify) to
persons contrary to the regulations
|
10(b)
|
$697.50
|
10
|
Failing to comply with pesticide label instructions
|
10(c)
|
$697.50
|
11
|
Instructing employees contrary to the Act/regulations
|
10(d)
|
$697.50
|
12
|
Failing to submit records
|
11
|
$467.50
|
13
|
Failing to apply for approval 60 days prior to intended start-date
of application
|
12(2)
|
$697.50
|
14
|
Failing to keep mitigatory equipment and supplies readily
available
|
12(3)
|
$697.50
|
15
|
Failing to notify administrator of commencement of spray
program
|
12(4)
|
$467.50
|
16
|
Failing to adhere to weather condition restrictions stipulated on
approval
|
12(5)
|
$697.50
|
17
|
Failing to ensure approval is available at loading, mixing or
application area
|
12(6)
|
$697.50
|
18
|
Failing to mark or identify all boundaries and buffer zones in
accordance with the regulations
|
12(7)
|
$697.50
|
19
|
Failing to accompany pilot and conduct prior aerial inspection of
site
|
12(8)
|
$697.50
|
20
|
Failing to keep and maintain record of each pesticide used or
applied
|
12(9)
|
$467.50
|
21
|
Failing to undertake public information and notice program
|
13(1)
|
$697.50
|
22
|
Failing to provide notice to public of application 20 days before
application commences
|
13(2)
|
$697.50
|
23
|
Failing to post signs before application of pesticide
|
13(3)(a)
|
$697.50
|
24
|
Failing to keep signs posted 20 days after application of pesticide
in research program
|
13(3)(b)
|
$697.50
|
25
|
Failing to post signs on all access roads 30 days before
application of pesticide
|
13(4)(a)
|
$697.50
|
26
|
Failing to apply fluorescent decals to signs when spray program
of pesticide commences
|
13(4)(a)(ii)
|
$697.50
|
27
|
Failing to deliver written notice to the owner or occupier 30 days
before application of pesticide
|
13(4)(b)
|
$697.50
|
28
|
Failing to publish or broadcast notice 20 days before application
of pesticide
|
13(4)(c)
|
$697.50
|
29
|
Altering or removing sign without authorization
|
13(6)
|
$697.50
|
30
|
Removing sign within 7 days of the completion of application of
pesticide without written authorization
|
13(7)
|
$697.50
|
31
|
Failing to remove sign before November 1st of the year of
issuance of permit
|
13(8)
|
$697.50
|
32
|
Failing to post approved sign after pesticide application
|
13(9)(a)
|
$697.50
|
33
|
Removing sign within 24 hours of last application at treatment
site
|
13(9)(b)
|
$697.50
|
34
|
Handling, using, abandoning or disposing of pesticide contrary to
product directions/limitations, or directions of administrator
(specify)
|
14(1)
|
$697.50
|
35
|
Handling, using, applying, abandoning or disposing of pesticide
in manner that results in contamination of the environment
|
14(2)
|
$697.50
|
36
|
Failing to report in writing any research with pesticide 15 days
before spraying commences
|
15
|
$467.50
|
37
|
Filling, flushing or cleaning pesticide sprayer or equipment in
manner that results in contamination
|
16
|
$697.50
|
38
|
Failing to prepare contingency plans respecting release of
pesticide
|
17
|
$697.50
|
39
|
Disposing of pesticide container contrary to the regulations
|
18(1)
|
$697.50
|
40
|
Failing to store pesticides in labelled containers
|
18(2)
|
$697.50
|
41
|
Spraying in buffer zone
|
19
|
$697.50
|
42
|
Failing to collect or accept pesticide, the registration of which
has been cancelled
|
20(1)(a)
|
$697.50
|
43
|
Failing to dispose of pesticide, the registration of which has been
cancelled in manner acceptable to administrator
|
20(1)(b)
|
$697.50
|
44
|
Using, applying, displaying or selling pesticide, the registration
of which has been cancelled
|
20(2)
|
$697.50
|
45
|
Applying pesticide in protected water area
|
21
|
$697.50
|
46
|
Storing commercial/restricted class pesticide in facility which
does not prevent the controlled release of the pesticide
|
22(2)(a)
|
$697.50
|
47
|
Failing to supply list of pesticides to local fire chief or designate
upon request
|
22(2)(b)
|
$697.50
|
48
|
Failing to placard each door leading to storage facility
|
22(2)(c)
|
$697.50
|
49
|
Failing to display emergency telephone numbers in storage
facility
|
22(2)(d)
|
$697.50
|
51
|
Constructing or expanding pesticide storage facility without
approval
|
24(1)
|
$697.50
|
52
|
Constructing or expanding pesticide storage facility within 30 m
of bank or ordinary high water mark of watercourse
|
25(a)
|
$697.50
|
53
|
Constructing pesticide storage facility within 60 m of well or
surface watercourse used to supply water
|
25(b)
|
$697.50
|
54
|
Constructing pesticide storage facility with flooring not
impervious to absorbing liquids
|
26(2)(a)
|
$697.50
|
55
|
Constructing pesticide storage facility with improper flooring
|
26(2)(b)
|
$697.50
|
56
|
Constructing pesticide storage facility without 10 cm curb around
perimeter of floor
|
26(2)(c)
|
$697.50
|
57
|
Constructing pesticide storage facility with openings in floor
|
26(2)(d)
|
$697.50
|
58
|
Constructing pesticide storage facility with inadequate ventilation
|
26(2)(e)
|
$697.50
|
59
|
Constructing pesticide storage facility without two entries/exits
|
26(2)(f)
|
$697.50
|
60
|
Constructing pesticide storage facility without adequate washing
facilities
|
26(2)(g)
|
$697.50
|
61
|
Constructing pesticide storage facility without readily available
source of water
|
26(2)(h)
|
$697.50
|
62
|
Storing pesticide in room which is not separated or locked from
other rooms
|
27(a)
|
$697.50
|
63
|
Storing pesticide on combustible racks
|
27(b)
|
$697.50
|
64
|
Storing pesticide not in conformity with manufacturer storage
requirements
|
27(c)
|
$697.50
|
65
|
Storing pesticide less than 10 cm above floor
|
27(d)
|
$697.50
|
66
|
Failing to store herbicides, insecticides and fungicides separately
|
27(e)
|
$697.50
|
67
|
Failing to store pesticide separately from flammable materials
|
27(f)
|
$697.50
|
68
|
Storing pesticide in manner that does not allow ready inspection
|
27(g)
|
$697.50
|
69
|
Storing food stuffs in pesticide storage facility
|
27(h)
|
$697.50
|
70
|
Failing to provide sufficient outside lighting at pesticide storage
facility
|
28(a)
|
$697.50
|
71
|
Failing to install windows with locks at pesticide storage facility
|
28(b)
|
$697.50
|
72
|
Leaving doors unlocked at pesticide storage facility
|
28(c)
|
$697.50
|
73
|
Failing to prevent unauthorized persons access to pesticide
storage facility
|
28(d)
|
$697.50
|
74
|
Failing to provide protective clothing, first aid kit and respirator
at pesticide storage facility
|
29(1)(a)
|
$697.50
|
75
|
Failing to provide eye washes and emergency showers at
pesticide storage facility
|
29(1)(b)
|
$697.50
|
76
|
Failing to provide to fire chief information on pesticides
|
29(1)(c)
|
$697.50
|
77
|
Failing to affix and maintain proper placard outside storage room
|
29(1)(d)
|
$697.50
|
78
|
Failing to display emergency telephone numbers in pesticide
storage facility
|
29(1)(e)
|
$697.50
|
79
|
Failing to display no smoking sign in pesticide storage area
|
29(2)
|
$697.50
|
80
|
Using open flames at pesticide storage facility without taking
safety measures
|
29(3)
|
$697.50
|
81
|
Failing to provide material safety data sheets at pesticide storage
facility
|
29(4)
|
$582.50
|
82
|
Failing to equip pesticide storage facility with fully operative fire
alarm system
|
29(5)(a)
|
$697.50
|
83
|
Placing pesticide in pesticide storage facility without approved
fire extinguishers
|
29(5)(b)
|
$697.50
|
84
|
Failing to provide containment and clean up materials at pesticide
storage facility
|
29(5)(c)
|
$697.50
|
85
|
Failing to ensure that there is unobstructed access at pesticide
storage facility
|
29(6)
|
$697.50
|
86
|
Failing to ensure compliance with legislation at pesticide storage
facility
|
30(1)(a)
|
$582.50
|
87
|
Failing to conduct monthly inspections at pesticide storage
facility
|
30(1)(b)
|
$697.50
|
88
|
Failing to immediately secure leaky container or package at
pesticide storage facility
|
30(1)(c)
|
$697.50
|
89
|
Failing to maintain book or report of monthly inspections and any
action taken
|
30(2)
|
$467.50
|
90
|
Failing to keep book or report while facility is in operation and 2
years after
|
30(3)
|
$467.50
|
91
|
Abandoning pesticide facility without 6 months notice
|
31(1)
|
$697.50
|
92
|
Abandoning pesticide facility in unapproved condition
|
31(2)
|
$697.50
|
|
Petroleum Management Regulations
|
1
|
Failing to meet minimum requirements set forth in Standard
(specify requirement)
|
6(1)
|
$697.50
|
2
|
Installing underground storage tank system with nominal capacity
of less than 2000 L
|
6(2)
|
$697.50
|
3
|
Failing to slope land around loading or unloading facilities at
bulk plant as required by the regulations
|
7(1)(a)
|
$582.50
|
4
|
Failing to have concrete or other impervious flooring surrounding
loading or unloading facilities at bulk plant
|
7(1)(b)
|
$582.50
|
5
|
Failing to have collecting device in area surrounding loading and
unloading facilities at bulk plant sufficient to contain release of
petroleum product
|
7(1)(c)
|
$582.50
|
6
|
Failing to provide fencing around bulk plant to secure it from
public entry
|
7(2)
|
$582.50
|
7
|
Failing to close or lock gates at bulk plant when not in use or
supervised
|
7(3)(a)
|
$582.50
|
8
|
Failing to lock loading valves, filling pipes or gauging pipes at
bulk plant when not in use or supervised
|
7(3)(b)
|
$582.50
|
9
|
Operating bulk plant without contingency plan
|
7(5)
|
$697.50
|
10
|
Operating bulk plant using tank vehicle as aboveground storage
tank without approval
|
7(6)
|
$812.50
|
11
|
Causing or permitting release of petroleum product
|
8
|
$812.50
|
12
|
Transferring petroleum product without supervising transfer at all
times
|
9(1)
|
$697.50
|
13
|
Causing or permitting overflow of petroleum product
|
9(2)
|
$812.50
|
14
|
Failing to immediately follow reporting procedures for spill
|
10(a)
|
$582.50
|
15
|
Failing to take steps to end spill or clean or rehabilitate affected
area (specify)
|
10(b)
|
$697.50
|
16
|
Failing to register underground storage tanks having combined
nominal capacity of 2000 L or greater
|
11(1)(a)
|
$697.50
|
17
|
Failing to register aboveground storage tanks having combined
nominal capacity of 4000 L or greater
|
11(1)(b)
|
$697.50
|
18
|
Failing to register aboveground storage tanks at marina having
combined nominal capacity of 230 L or greater
|
11(1)(c)
|
$697.50
|
19
|
Failing to affix tag, label or similar device in location or manner
determined by Minister or Administrator (specify)
|
11(6)
|
$582.50
|
20
|
Delivering petroleum product to storage tank system with
unregistered tank
|
11(9)
|
$697.50
|
21
|
Failing to notify Department within 30 days of sale or transfer of
storage tank system
|
11(10)
|
$467.50
|
22
|
Failing to remove steel underground storage tank system or
underground steel pipeline (specify) 15 years from date of
installation
|
12(1)
|
$697.50
|
23
|
Failing to meet Class A site requirements in Standard (specify)
for underground storage tank system
|
13(2)
|
$697.50
|
24
|
Failing to notify Administrator or inspector at least 3 working
days prior to starting installation
|
13(3)
|
$467.50
|
25
|
Installer failing to provide storage tank system installation report
within 30 days of completing installation
|
13(4)
|
$467.50
|
26
|
Failing to notify Administrator or inspector at least 3 working
days prior to starting alteration
|
14(1)
|
$467.50
|
27
|
Installer failing to provide storage tank system alteration report
within 30 days of completing alteration
|
14(3)
|
$467.50
|
28
|
Failing to provide detailed description to Administrator or
inspector within 72 hours of initiating emergency alteration
|
14(5)
|
$467.50
|
29
|
Failing to notify Administrator or inspector at least 3 working
days prior to starting removal
|
15(1)
|
$467.50
|
30
|
Failing to remove associated underground piping and related
materials with storage tank system
|
15(2)
|
$697.50
|
31
|
Installer failing to provide storage tank system removal report
within 30 days of completing removal
|
15(3)
|
$467.50
|
32
|
Failing to remediate contamination after storage tank system
removal
|
15(4)
|
$697.50
|
33
|
Installing, altering or removing storage tank system without
certificate of qualification
|
16(3)
|
$812.50
|
34
|
Installer failing to be present at all times during installation,
alteration or removal of storage tank system
|
17(1)
|
$697.50
|
35
|
Installer failing to produce certificate of qualification for
inspection
|
17(2)
|
$467.50
|
36
|
Failing to conduct maintenance checks on sacrificial anode
system as required by the regulations
|
18(1)(b)
|
$582.50
|
37
|
Failing to conduct maintenance checks on impressed current
system as required by the regulations
|
18(1)(c)
|
$582.50
|
38
|
Failing to conduct maintenance checks on all electrical and
mechanical leak detection systems as required by the regulations
|
18(1)(d)
|
$582.50
|
39
|
Failing to visually inspect aboveground storage tank system as
required by the regulations
|
18(1)(e)
|
$582.50
|
40
|
Failing to check observation wells for liquid product or vapours
as required by the regulations
|
18(1)(f)
|
$582.50
|
41
|
Failing to immediately repair storage tank system where there is
corrosion failure or mechanical problem or notify Administrator
or inspector
|
18(2)
|
$697.50
|
42
|
Failing to measure, reconcile and record petroleum product level
in underground storage tank each day product is added or
removed
|
19(1)(a)(i)
|
$697.50
|
43
|
Failing to measure, reconcile and record petroleum product level
in underground storage tank at least weekly
|
19(1)(a)(ii)
|
$697.50
|
44
|
Failing to reconcile water level in underground storage tank and
include in all reconciliations
|
19(1)(b)
|
$697.50
|
45
|
Failing to reconcile inventory control measurements for
underground storage tank as required by the regulations
|
19(2)
|
$697.50
|
46
|
Failing to record and include in monthly summary any gain or
loss of petroleum product in underground storage tank
|
19(3)
|
$467.50
|
47
|
Failing to notify Department of unexplained loss or gain of 0.5%
or more of inventory in underground storage tank system in any
month
|
19(4)(a)
|
$467.50
|
48
|
Failing to notify Department of 5 or more consecutive days of
losses or gains in underground storage tank system
|
19(4)(b)
|
$467.50
|
49
|
Failing to notify Department of 18 or more days per month of
losses or gains in underground storage tank system (measured
daily)
|
19(4)(c)
|
$467.50
|
50
|
Failing to notify Department of water level in underground
storage tank system exceeding 50 mm
|
19(4)(d)
|
$467.50
|
51
|
Failing to measure, reconcile and record petroleum product level
in aboveground storage tank at least weekly
|
20(1)
|
$697.50
|
52
|
Failing to notify Department of unexplained loss or gain of 1.0%
or more of inventory in aboveground storage tank system in any
month
|
20(2)(a)
|
$467.50
|
53
|
Failing to notify Department of 4 or more consecutive weeks of
losses or gains in excess of 1.0% of inventory in aboveground
storage tank system for each week
|
20(2)(b)
|
$467.50
|
54
|
Failing to provide secondary containment and leak monitoring
devices that meet Standard on system connected to heating
appliance
|
21(a)
|
$467.50
|
55
|
Failing to provide continuous leak detection to equivalent level of
safety approved by Administrator on system connected to heating
appliance
|
21(b)
|
$467.50
|
56
|
Failing to maintain inventory control records and reconciliation
data for 2 years
|
22(1)
|
$467.50
|
57
|
Failing to make computerized inventory control records and
reconciliation data available within 48 hours of request
|
22(2)
|
$467.50
|
58
|
Failing to obtain and maintain records of previous owner
|
22(4)
|
$467.50
|
59
|
Failing to comply with upgrade requirements (specify) within
time frame specified in upgrade program
|
23(3)
|
$697.50
|
60
|
Failing to replace, repair or remove storage tank system or
portion of it when leak detected within time frame required by
Administrator or inspector
|
24(2)
|
$697.50
|
61
|
Failing to conduct leak detection test
|
24(3)
|
$697.50
|
62
|
Failing to submit results of leak detection test to Administrator or
inspector
|
24(4)
|
$582.50
|
63
|
Failing to immediately notify Department of leak when system
fails leak detection test
|
24(5)
|
$697.50
|
64
|
Failing to empty and purge underground storage tank system after
unused for 12 consecutive months or more
|
25(1)(a)
|
$582.50
|
65
|
Failing to lock all fill and gauged pipe openings in underground
storage tank system and block access to aboveground storage
tank tops
|
25(1)(b)
|
$582.50
|
66
|
Failing to operate and maintain impressed current cathodic
protection system when underground storage tank system is
unused
|
25(1)(c)
|
$582.50
|
67
|
Failing to lock all fill and gauged pipe openings in aboveground
storage tank system and block access to aboveground tank tops
|
25(2)(a)
|
$582.50
|
68
|
Failing to operate and maintain impressed current cathodic
protection system when aboveground storage tank system is
unused
|
25(2)(b)
|
$582.50
|
69
|
Failing to gauge or dip underground storage tanks on monthly
basis after underground storage tank system unused for 6
consecutive months or more
|
25(3)
|
$582.50
|
70
|
Failing to perform leak detection test and submit results to
Administrator or inspector prior to reuse of underground storage
tank system after unused for 12 consecutive months or more
|
25(4)
|
$582.50
|
71
|
Failing to replace, repair or remove underground storage tank
system or portion of it when leak detected within time frame
required by Administrator or inspector
|
25(5)
|
$697.50
|
72
|
Failing to remove or abandon storage tank system after non-use
for 24 consecutive months or more
|
26(1)
|
$697.50
|
73
|
Failing to abandon storage tank system in accordance with
Standard
|
26(3)
|
$697.50
|
74
|
Failing to decommission removed underground tank at approved
facility
|
27(1)(a)
|
$697.50
|
75
|
Failing to re-certify removed underground storage tank before
reuse as required by the regulations
|
27(1)(b)
|
$697.50
|
76
|
Reusing removed underground tank for aboveground storage
without approval of Administrator or inspector
|
27(4)
|
$697.50
|
77
|
Failing to decommission relocated aboveground storage tank at
approved facility
|
27(5)(a)
|
$697.50
|
78
|
Failing to re-certify relocated aboveground storage tank before
reuse as required by the regulations
|
27(5)(b)
|
$697.50
|
79
|
Decommissioning aboveground storage tank at installation site
without approval from Administrator or inspector
|
27(6)
|
$697.50
|
|
Solid Waste-Resource Management Regulations
|
1
|
Selling beverage container that is not refillable or recyclable
|
14(1)
|
$697.50
|
2
|
Selling, manufacturing, distributing, offering to sell or permitting
to be sold (specify) beverage in container that is subject to
deposit-refund system that is not labelled “Return for Refund” or
words to like effect
|
14(3)
|
$697.50
|
3
|
Failing to collect cash deposit and show amount of deposit on
receipt for redeemable beverage container
|
15(2)
|
$467.50
|
4
|
Failing to provide cash refund of 100% of full cash deposit on
receipt of refillable beverage container
|
15(3)(a)
|
$467.50
|
5
|
Failing to provide cash refund of 50% of full cash deposit on
receipt of non-refillable beverage container
|
15(3)(b)
|
$467.50
|
6
|
Failing to register with Board all beverage containers distributed
and designate each container registered by beverage product,
container size and container type
|
16(3)
|
$697.50
|
7
|
Failing to file with Board report of all units sold, remittance due,
and any cash deposits collected as required by regulations
|
16(5)
|
$697.50
|
8
|
Failing to file at request of Board report of all units sold,
remittance due, and any cash deposits collected as required by
regulations
|
16(5A)
|
$697.50
|
9
|
Failing to report tax status as required by regulations
|
16(5B)
|
$467.50
|
10
|
Failing to accept intact and reasonably clean redeemable
beverage container
|
17(6)
|
$697.50
|
11
|
Failing to clearly display notice indicating deposit charged,
refund available, location of nearest depot for redeeming
beverage container and hours of operation as required by
regulations
|
18(a)-(d)
|
$295.00
|
12
|
Supplying new tire without being registered with Administrator
|
18A(5)
|
$697.50
|
13
|
Supplying new tire without entering into industry stewardship
agreement with Administrator
|
18A(6)(a)
|
$697.50
|
14
|
Failing to comply with industry stewardship agreement on breach
or default by agent
|
18A(6)(c)
|
$697.50
|
15
|
Falsifying, rendering misleading, unlawfully altering or failing to
provide (specify) report or record required by Minister or
Administrator
|
18A(7)
|
$1157.50
|
16
|
Selling, offering for sale or distributing consumer paint product
without being registered with Board
|
18D(1)(a)
|
$697.50
|
17
|
Selling, offering for sale or distributing consumer paint product
without operating consumer paint product stewardship program
or entering into industry stewardship agreement with Board
(specify)
|
18D(1)(b)
|
$697.50
|
18
|
Selling, offering for sale or distributing consumer paint product
without consumer paint product stewardship program authorized
by Minister
|
18D(1)(c)
|
$697.50
|
19
|
Selling, offering for sale or distributing consumer paint product
acquired from brand owner who is not registered with Board
|
18D(2)
|
$697.50
|
20
|
Failing to submit proposal for consumer paint product
stewardship program to Minister for authorization
|
18E(1)
|
$467.50
|
21
|
Failing to operate consumer paint product stewardship program
in accordance with terms and conditions of authorization
|
18E(4)
|
$697.50
|
22
|
Failing to provide annual report to Administrator with
information respecting total amount of consumer paint products
sold and post-consumer paint products collected
|
18F(1)(a)
|
$467.50
|
23
|
Failing to provide annual report to Administrator with
information respecting total amount of post-consumer paint
products processed or in storage (specify)
|
18F(1)(b)
|
$467.50
|
24
|
Failing to provide annual report to Administrator with
information respecting percentage of post-consumer paint
products that were treated or contained, reduced, reused, recycled
or recovered (specify)
|
18F(1)(c)
|
$467.50
|
25
|
Failing to provide annual report to Administrator with
information respecting efforts taken through marketing strategies
to reduce post-consumer paint products and packaging waste
|
18F(1)(d)
|
$467.50
|
26
|
Failing to provide annual report to Administrator with
information respecting types of processes used to reduce, reuse,
recycle or recover (specify) as set out in regulations
|
18F(1)(e)
|
$467.50
|
27
|
Failing to provide annual report to Administrator with
information respecting location of return collection facilities or
depots
|
18F(1)(f)
|
$467.50
|
28
|
Failing to provide annual report to Administrator with
information respecting location of any long-term containment,
treatment or processing facilities (specify) for post-consumer
paint products
|
18F(1)(g)
|
$467.50
|
29
|
Failing to provide annual report to Administrator with
information respecting types of educational information and
programs provided
|
18F(1)(h)
|
$467.50
|
30
|
Failing to provide annual report to Administrator with
information respecting process of internal accountability to
monitor effectiveness
|
18F(1)(i)
|
$467.50
|
31
|
Failing to provide in annual report any information requested by
Administrator (specify)
|
18F(1)(j)
|
$467.50
|
32
|
Failing to provide return collection facility at premises of retailer
or enter into industry stewardship agreement with Board to
operate collection depot for post-consumer paint products
(specify)
|
18G(1)(a)
|
$697.50
|
33
|
Failing to implement education and awareness program for
consumers of consumer paint products as specified in subclauses
18G(1)(b)(i) to (iii)
|
18G(1)(b)
|
$467.50
|
34
|
Failing to confirm post-consumer paint products are recycled or
reused
|
18G(1)(c)
|
$467.50
|
35
|
Failing to ensure 70% of post-consumer paint product collected
at return collection facility is reused or recycled
|
18G(1)(d)
|
$467.50
|
36
|
Failing to provide at point of sale or display place for display of
education and awareness program information
|
18G(3)
|
$295.00
|
37
|
Failing to accept post-consumer paint product
|
18H(1)
|
$697.50
|
38
|
Failing to comply with rules and standards set forth by Board
|
18H(2)
|
$697.50
|
39
|
Failing to operate facility or depot (specify) during regular
business hours
|
18H(3)(a)
|
$467.50
|
40
|
Failing to accept quantity of post-consumer paint products that
does not exceed the maximum allowable daily quantity as
authorized by Administrator
|
18H(3)(b)
|
$697.50
|
41
|
Charging fee for accepting post-consumer paint product
|
18H(3)(c)
|
$697.50
|
42
|
Falsifying, rendering misleading, unlawfully altering or failing to
provide (specify) information
|
18I
|
$1157.50
|
43
|
Failing to affix brand name, logo or image in plain view on
electronic product
|
18L(1)
|
$467.50
|
44
|
Brand owner selling, offering for sale or distributing electronic
product (specify) without authorized electronic product
stewardship program
|
18L(2)
|
$697.50
|
45
|
Retailer selling, offering for sale or distributing electronic
product (specify) without authorized electronic product
stewardship program
|
18L(4)
|
$697.50
|
46
|
Failing to submit electronic product stewardship program to
Minister for approval 6 months before date specified in Schedule
“B”
|
18M(1)
|
$697.50
|
47
|
Brand owner failing to comply with terms and conditions of
electronic product stewardship program authorization
|
18M(3)
|
$697.50
|
48
|
Failing to provide all education and awareness program
information at point of display or sale (specify)
|
18N(2)
|
$295.00
|
49
|
Failing to inform Administrator in writing on or before June 30
or date set by Administrator (specify) of total quantity of
electronic products collected
|
18O(1)
|
$697.50
|
50
|
Failing to provide any information specified in clauses 18O(2)(a)
to (e) (specify) on request of Minister
|
18O(2)
|
$467.50
|
51
|
Failing to submit revised electronic product stewardship program
for authorization by Minister
|
18O(3)
|
$697.50
|
52
|
Charging fee for accepting electronic products
|
18P
|
$697.50
|
53
|
Submitting false or misleading information
|
18Q
|
$1157.50
|
54
|
Brand owner selling, offer[ing] or distributing oil, glycol, oil
filters or product containers (specify) without oil and glycol
stewardship program
|
18T(1)
|
$697.50
|
55
|
Retailer selling, offer[ing] or distributing oil, glycol, oil filters or
product containers (specify) without oil and glycol stewardship
program
|
18T(2)
|
$679.50
|
56
|
Operator of return collection facility charging fee for accepting
used oil, used glycol, used oil filters or product containers
(specify)
|
18T(3)
|
$679.50
|
57
|
Brand owner failing to submit proposal for oil, and glycol
stewardship program for authorization by deadline
|
18U(1)
|
$467.50
|
58
|
Brand owner failing to operate an oil and glycol stewardship
program in accordance with terms and conditions of
authorization
|
18U(4)
|
$697.50
|
59
|
Brand owner failing to include information required by
regulations (specify) in proposal for oil and glycol stewardship
program
|
18V(1)
|
$467.50
|
60
|
Brand owner failing to provide additional information required
by Minister for proposal for oil and glycol stewardship program
|
18V(2)
|
$467.50
|
61
|
Brand owner failing to provide annual report on or before May
30 detailing effectiveness of oil and glycol stewardship program
that includes all information required by regulations (specify)
|
18W(1)
|
$467.50
|
62
|
Brand owner failing to provide statement in writing of total
amount of oil, glycol, oil filters and product containers sold
during previous calendar year
|
18W(2)
|
$467.50
|
63
|
Releasing or causing litter to be released (specify) into
environment contrary to regulations
|
19
|
$467.50
|
64
|
Permitting release of litter from commercial outlet, service outlet,
plant, building, facility or thing (specify)
|
20(1)
|
$467.50
|
65
|
Failing to clean up litter discharged from commercial outlet,
service outlet, plant, building, facility or thing (specify)
|
20(2)
|
$467.50
|
66
|
Permitting release of litter at construction or demolition site
(specify)
|
21(1)
|
$697.50
|
67
|
Failing to clean up discharged litter from construction or
demolition site (specify)
|
21(2)
|
$697.50
|
68
|
Failing to provide and service, maintain or empty (specify)
receptacles for litter and recyclable materials
|
22(1)
|
$467.50
|
69
|
Failing to keep property or lands within 15 m of property
boundaries (specify) free from litter
|
22(2)
|
$467.50
|
70
|
Failing to collect and dispose of discarded materials as prescribed
in regulations
|
22(3)
|
$467.50
|
71
|
Failing to provide adequate receptacles for litter and recyclable
materials at public or private event
|
23(1)(a)
|
$467.50
|
72
|
Failing to service, maintain and empty receptacles for litter and
recyclable materials at public or private event
|
23(1)(b)
|
$467.50
|
73
|
Failing to ensure property where event is held or lands within
15 m of property boundaries (specify) are free from litter within
24 hours after event
|
23(2)
|
$467.50
|
74
|
Attaching flyer, advertisement or other literature to utility pole,
structure, fence or thing (specify) without approval of owner or
local authority
|
24(1)
|
$467.50
|
75
|
Failing to put posting date on flyer, advertisement or other
literature
|
24(2)(a)
|
$467.50
|
76
|
Failing to remove flyer, advertisement or other literature within
30 days after event
|
24(2)(b)
|
$467.50
|
77
|
Failing to dispose of flyer, advertisement or other literature as
prescribed in the regulations
|
24(2)(c)
|
$467.50
|
78
|
Distributing flyer, advertisement or other literature by placing it
on parked vehicle
|
24(3)
|
$467.50
|
79
|
Abandoning structure, vehicle or thing (specify) on frozen
watercourse
|
25(a)
|
$467.50
|
80
|
Failing to remove structure, vehicle or thing (specify) from
frozen watercourse
|
25(b)
|
$467.50
|
81
|
Constructing, operating, expanding or modifying (specify) a
composting facility without approval
|
27
|
$812.50
|
82
|
Failing to supply additional information required for approval to
operate composting facility
|
28
|
$697.50
|
83
|
Failing to maintain composting facility in clean and orderly
condition
|
29(a)
|
$697.50
|
84
|
Failing to remove all material from property where composting
facility has ceased operation and recycle or dispose of it as
required by the regulations
|
29(b)
|
$697.50
|
85
|
Destroying or disposing of designated material listed in Column
1 of Schedule “B” (specify material) in landfill or incinerator
|
30(1)
|
$812.50
|
86
|
Accepting designated material listed in Column 1 of Schedule
“B” (specify material) for destruction or disposal in landfill or
incinerator
|
30(2)
|
$812.50
|
87
|
Failing to provide plan for implementing ban of designated
materials from landfills and incinerators
|
30(3)
|
$697.50
|
88
|
Owning, constructing, managing, operating, altering or modifying
(specify) landfill without approval
|
31(1)
|
$812.50
|
89
|
Owning, constructing, managing, operating, altering or modifying
(specify) a storage, transfer, processing or disposal (specify) site
for construction and demolition debris without Ministerial
approval
|
31(2)(a)
|
$812.50
|
90
|
Disposing of treated wood at construction and demolition debris
disposal site
|
31(2)(c)
|
$812.50
|
91
|
Owning, constructing, managing, operating, altering or modifying
(specify) incinerator for disposal of municipal solid waste
without approval
|
31(3)
|
$812.50
|
92
|
Owning or constructing (specify) or managing, operating, altering
or modifying operation of (specify) ash disposal site without
approval
|
31(4)
|
$812.50
|
93
|
Failing to supply additional information required for approval to
operate landfill or incinerator (specify) for disposal of municipal
solid waste
|
32(1)
|
$812.50
|
94
|
Failing to supply additional information required for approval to
operate landfill for municipal solid waste
|
33
|
$697.50
|
95
|
Failing to supply additional information required for approval to
operate incinerator for municipal solid waste
|
34
|
$697.50
|
96
|
Failing to keep books, records and accounts of landfill or
incinerator (specify) operations
|
35(1)
|
$697.50
|
97
|
Failing to submit to Administrator data about materials received
at landfill or incinerator (specify)
|
35(2)
|
$697.50
|
98
|
Permitting, carrying out or being responsible for (specify) open
burning of municipal solid waste
|
36
|
$812.50
|
99
|
Owning, operating or managing (specify) incinerator for
municipal solid waste that fails to meet national standards or
standards prescribed by Minister (specify)
|
37
|
$697.50
|
100
|
Owning, operating or managing (specify) incinerator that exceeds
stack discharge limits prescribed in regulations
|
38(1)
|
$697.50
|
101
|
Failing to use test method as prescribed by regulations or in
writing by Administrator (specify)
|
38(2)
|
$697.50
|
102
|
Failing to prepare and submit regional solid waste-resource
management plan
|
40(1)(a)
|
$697.50
|
103
|
Failing to implement regional solid waste-resource management
plan in specified time frame
|
40(1)(b)
|
$697.50
|
104
|
Failing to prepare and submit reports respecting progress towards
achieving 50% solid waste diversion
|
40(1)(c)
|
$697.50
|
|
Sulphide Bearing Material Regulations
|
1
|
Disposing of sulphide bearing material greater than 500 m3 in situ
or 1300 tonnes without approval
|
4(1)
|
$697.50
|
2
|
Disposing of sulphide bearing material in manner not approved in
the regulations
|
4(2)
|
$697.50
|
3
|
Failing to provide samples of sulphide bearing material as
required by the regulations
|
7(1)
|
$582.50
|
4
|
Failing to forward test results of sampling for sulphide bearing
material before work commences
|
8(5)
|
$582.50
|
5
|
Removing any vegetation or soil overlying aggregate in excess of
amount permitted by the regulations
|
9(1)(a)
|
$582.50
|
6
|
Failing to divert surface runoff away from sulphide bearing
material
|
9(1)(b)
|
$582.50
|
7
|
Failing to minimize the volume of aggregate distributed
|
9(1)(c)
|
$582.50
|
8
|
Failing to remove excavated material immediately and in
accordance with regulations
|
9(1)(d)
|
$582.50
|
9
|
Failing to minimize exposure of construction activities on
sulphide bearing materials
|
9(1)(e)
|
$582.50
|
10
|
Failing to divert runoff from disturbed area to centralized point
|
9(1)(f)
|
$582.50
|
11
|
Storing or using sulphide bearing material without approval
|
9(2)
|
$812.50
|
12
|
Disposing of sulphide bearing material other than at approved
site
|
10(1)
|
$697.50
|
13
|
Locating sulphide bearing material disposal site within 60 m of
watercourse/well (specify)
|
10(2)(a)
|
$697.50
|
14
|
Locating sulphide bearing material disposal site near
well/watercourse (specify) within distance prohibited by Minister
|
10(2)(b)
|
$582.50
|
15
|
Disposing of sulphide bearing material in marine waters under
jurisdiction of Province
|
10(3)
|
$697.50
|
16
|
Disposing of sulphide bearing material in fresh water
|
10(4)
|
$697.50
|
17
|
Failing to direct effluent/runoff to centralized point
|
11(a)
|
$582.50
|
18
|
Failing to monitor effluent/runoff as prescribed in the regulations
|
11(b)
|
$582.50
|
19
|
Failing to cover sulphide bearing material with impervious
material
|
11(c)
|
$582.50
|
20
|
Failing to contour sulphide bearing material site to prevent
ponding
|
11(d)
|
$582.50
|
21
|
Failing to submit estimate of the total volume of sulphide bearing
material to be deposited at disposal site
|
12(1)(a)
|
$582.50
|
22
|
Failing to provide information, design and site plans for sulphide
bearing material disposal site
|
12(1)(b)
|
$582.50
|
|
Used Oil Regulations
|
1
|
Selling, offering for sale, transferring, using or disposing of
(specify) used oil that has not been analyzed
|
5(1)(a)
|
$697.50
|
2
|
Selling, offering for sale, transferring, using or disposing of
(specify) used oil without obtaining certificate of analysis
|
5(1)(b)
|
$697.50
|
3
|
Selling, offering for sale, transferring, using or disposing of
(specify) contaminated used oil
|
5(1)(c)
|
$697.50
|
4
|
Failing to retain certificate of analysis for 2 years from date of
certificate
|
5(2)
|
$697.50
|
5
|
Failing to produce and provide copy of certificate of analysis
|
5(3)
|
$697.50
|
6
|
Failing to maintain record of used oil sold, transferred or
disposed of (specify) as required by regulations
|
5(4)(a)(b)
(c)
|
$467.50
|
7
|
Failing to keep record of sales, transfers or dispositions (specify)
of used oil for 2 years after sale, transfer or disposition (specify)
|
5(4)(d)
|
$467.50
|
8
|
Carrying on business of used oil collection without approval
|
6(1)(b)
|
$697.50
|
9
|
Holding oneself out as used oil collector without approval
|
6(1)(c)
|
$697.50
|
10
|
Providing services of used oil collector without approval
|
6(1)(d)
|
$697.50
|
11
|
Failing to provide written report as required by regulations
|
6(5)(a)
|
$467.50
|
12
|
Failing to provide estimate of quantity of used oil in storage
|
6(5)(b)
|
$697.50
|
13
|
Operating unapproved used oil storage facility
|
7(1)
|
$697.50
|
14
|
Extending or modifying used oil storage facility without
amendment to existing approval
|
7(2)
|
$697.50
|
15
|
Selling, offering for sale, transferring or disposing of (specify)
contaminated used oil to person other than used oil collector
|
9(1)
|
$697.50
|
16
|
Using or disposing of (specify) contaminated used oil contrary to
regulations
|
9(2)
|
$697.50
|
17
|
Failing to notify Administrator of possession of contaminated
used oil
|
9(3)
|
$697.50
|
18
|
Diluting contaminated used oil containing PCBs or organic
halogen compounds in excess of allowable limits without
Administrator’s written approval
|
10
|
$697.50
|
19
|
Adding substance to used oil or contaminated used oil (specify)
for the purpose of disposal without Administrator’s written
approval
|
11(a)
|
$697.50
|
20
|
Encouraging others to add substance to used oil or contaminated
used oil (specify) for the purpose of disposal without
Administrator’s written approval
|
11(b)
|
$697.50
|
21
|
Selling crankcase oil without providing or contracting to provide
(specify) used oil return facility
|
12(1)
|
$697.50
|
22
|
Contracting with operator of used oil return facility not within
5 km radius of seller’s premises without Administrator’s written
approval
|
12(3)
|
$697.50
|
23
|
Failing to accept used crankcase oil from any person on daily
basis up to prescribed quantities
|
12(4)(b)
|
$697.50
|
24
|
Failing to operate used oil return facility during normal business
hours of premises
|
12(4)(c)
|
$697.50
|
26
|
Failing to post sign at seller’s premises as required by regulations
|
12(5)
|
$697.50
|
27
|
Wholesaler or distributor providing crankcase oil to seller
without first determining that seller has or has contracted to
provide (specify) used oil return facility
|
12(6)
|
$697.50
|
28
|
Burning used oil contrary to regulations
|
13(1)
|
$697.50
|
29
|
Burning used oil not verified to be uncontaminated by certificate
respecting laboratory analysis
|
13(2)(a)
|
$697.50
|
30
|
Burning used oil without notifying Administrator at least 30 days
prior to commencement of burning
|
13(2)(b)
|
$697.50
|
31
|
Burning used oil without Administrator’s written approval
|
13(2)(c)
|
$697.50
|
32
|
Failing to complete and submit report as required by regulations
|
13(2)(d)
|
$467.50
|
33
|
Burning used crankcase oil in used oil furnace without notifying
Administrator
|
13(3)(a)
|
$697.50
|
34
|
Burning used crankcase oil not produced as result of vehicle oil
changes in used oil furnace
|
13(3)(b)(i)
|
$697.50
|
35
|
Burning used crankcase oil originating from used oil storage
facility or used oil return facility (specify) in used oil furnace
|
13(3)(b)(ii)
|
$697.50
|
36
|
Applying used oil or contaminated used oil (specify) to public or
private highway, road, land, trail, bridge, parking area or land
(specify)
|
14
|
$697.50
|
|
Water and Wastewater Facilities and Public Drinking
Water Supplies Regulations
|
|
Part 1 - Facility Classification and Operator Certification
|
|
|
1
|
Owner failing to obtain facility classification certificate for new
or non-operational facility before facility begins operating
|
7(1)
|
$697.50
|
2
|
Owner of operational facility failing to obtain facility
classification certificate for existing facility on or before October
1, 2006
|
7(3)
|
$697.50
|
3
|
Owner failing to notify administrator of modification to or
extension of classified facility
|
13(1)
|
$697.50
|
4
|
Owner failing to pay fee for new facility classification certificate
within 90 days of advisory from administrator
|
13(3)(a)
|
$697.50
|
5
|
Transferring operator certification certificate
|
23(4)
|
$697.50
|
6
|
Operator failing to produce operator certification certificate when
requested
|
23(5)
|
$697.50
|
7
|
Owner failing to provide resources for operator to get CEUs
required to renew operator certificate
|
26
|
$697.50
|
8
|
Owner failing to designate operator who meets requirements of
Section 28 to be in direct responsible charge of new or non-operational facility before facility begins operating
|
27(1)
|
$697.50
|
9
|
Owner of operational facility failing to designate operator who
meets requirements of Section 28 to be in direct responsible
charge of existing facility on or before October 30, 2005
|
27(2)
|
$697.50
|
10
|
Failing to designate operator who meets requirements of Section
28 to be in direct responsible charge before applicable date for
class of facility
|
27(3)
|
$697.50
|
11
|
Owner failing to ensure operator who meets requirements of
Section 28 is always designated and in overall direct responsible
charge
|
27(4)
|
$697.50
|
12
|
Operator failing to hold valid operator certification certificate as
required by regulations
|
28(1)
|
$697.50
|
13
|
Owner designating operator-in-training to be in overall direct
responsible charge
|
28(2)
|
$697.50
|
14
|
Owner failing to designate temporary operator who meets
requirements of Section 28 or clause 29(1)(b) (specify) to be in
direct responsible charge
|
29(1)
|
$697.50
|
15
|
Owner assigning direct responsible charge for facility for more
than 150 days in 12 consecutive months
|
29(2)
|
$697.50
|
16
|
Owner assigning temporary direct responsible charge to operator
holding operator-in-training operator certification certificate
|
29(3)
|
$697.50
|
17
|
Owner failing to submit transition plan to administrator
|
30(1)
|
$697.50
|
18
|
Owner failing to submit transition plan that is in accordance with
Transition Plan Guide to administrator
|
30(2)(a)
|
$697.50
|
19
|
Owner failing to submit transition plan to administrator within 90
days as required by regulations
|
30(2)(b)
|
$697.50
|
|
Part 2 - Monitoring of Public Drinking Water Supplies
|
20
|
Owning, operating or maintaining (specify) public drinking water
supply without registering supply with Department
|
32(1)
|
$697.50
|
21
|
Owner failing to sample, test and monitor drinking water supply
for microbiological quality
|
33(1)(a)
|
$697.50
|
22
|
Owner failing to sample, test and monitor drinking water supply
for general chemical and physical quality
|
33(1)(b)
|
$697.50
|
23
|
Owner failing to sample, test and monitor drinking water supply
for disinfection residual
|
33(1)(c)
|
$697.50
|
24
|
Owner failing to sample, test and monitor drinking water supply
for source and treated water turbidity
|
33(1)(d)
|
$697.50
|
25
|
Owner failing to sample, test and monitor drinking water supply
for fluoride concentrations
|
33(1)(e)
|
$697.50
|
26
|
Owner failing to sample, test and monitor drinking water supply
for any substances required by Minister or administrator
|
33(1)(f)
|
$697.50
|
27
|
Owner failing to test samples as required by Guidelines or as
required by Minister or administrator (specify)
|
33(2)
|
$697.50
|
28
|
Owner failing to record results of tests and forward them in
accordance with Guidelines or as required by Minister or
administrator (specify)
|
33(3)
|
$697.50
|
29
|
Owner failing to notify Minister or administrator that drinking
water supply does not meet criteria as set out in Guidelines for
Canadian Drinking Water Quality
|
34(1)(a)
|
$697.50
|
30
|
Owner failing to notify Minister or administrator of incident of
raw water contamination
|
34(1)(b)
|
$697.50
|
31
|
Owner failing to notify Minister or administrator of evidence of
outbreak of waterborne illness
|
34(1)(c)
|
$697.50
|
32
|
Owner failing to notify Minister or administrator of suspected
cross-connection or negative pressure (specify)
|
34(1)(d)
|
$697.50
|
33
|
Owner failing to notify Minister or administrator of ineffective
disinfection caused by condition prescribed in regulations
|
34(1)(e)
|
$697.50
|
34
|
Owner failing to take corrective action as set out in Guidelines or
as required by Minister or administrator (specify) for event in
subsection 34(1) (specify)
|
34(2)
|
$697.50
|
35
|
Owner failing to ensure that microbiological, chemical and
physical characteristics of drinking water do not exceed
maximum or interim acceptable concentration (specify) for
substances as set out in Guidelines for Canadian Drinking Water
Quality
|
35
|
$697.50
|
|
Well Construction Regulations
|
1
|
Holding oneself out as well driller without well driller certificate
of qualification
|
4(1)(a)
|
$697.50
|
2
|
Drilling or operating machine for purpose of drilling well without
well driller certificate of qualification
|
4(1)(b)
|
$697.50
|
3
|
Constructing drilled well without well driller certificate of
qualification
|
4(1)(c)
|
$697.50
|
4
|
Repairing drilled well without well driller certificate of
qualification
|
4(1)(d)
|
$697.50
|
5
|
Modifying drilled well without well driller certificate of
qualification
|
4(1)(e)
|
$697.50
|
6
|
Decommissioning drilled well without well driller certificate of
qualification
|
4(1)(f)
|
$697.50
|
7
|
Failing to ensure drilled well is constructed and casing, liner or
screen (specify) is installed in accordance with Act, regulations
or guidelines (specify)
|
4(5)
|
$697.50
|
8
|
Holding oneself out as well digger without well digger certificate
of qualification
|
5(1)(a)
|
$697.50
|
9
|
Digging or operating machinery to dig well without well digger
certificate of qualification
|
5(1)(b)
|
$697.50
|
10
|
Constructing dug well without well digger certificate of
qualification
|
5(1)(c)
|
$697.50
|
11
|
Repairing dug well without well digger certificate of
qualification
|
5(1)(d)
|
$697.50
|
12
|
Modifying dug well without well digger certificate of
qualification
|
5(1)(e)
|
$697.50
|
13
|
Decommissioning dug well without well digger certificate of
qualification
|
5(1)(f)
|
$697.50
|
14
|
Failing to ensure dug well is constructed and well casing installed
(specify) in accordance with Act, regulations or guidelines
(specify)
|
5(5)
|
$697.50
|
15
|
Failing to mark name in conspicuous place on each piece of
machinery used for drilling or digging well (specify)
|
6(1)(a)
|
$295.00
|
16
|
Failing to mark address in conspicuous place on each piece of
machinery used for drilling or digging well (specify)
|
6(1)(b)
|
$295.00
|
17
|
Failing to mark certificate of qualification number in conspicuous
place on each piece of machinery used for drilling or digging
well (specify)
|
6(1)(c)
|
$295.00
|
18
|
Marking machinery with figure or letter less than 50 mm in
height
|
6(2)
|
$295.00
|
19
|
Holding oneself out as Class II well pump installer without Class
I or Class II well pump installer certificate of qualification
|
7(1)(a)
|
$697.50
|
20
|
Installing pump with single-phase motor drive 1.5 HP or less
without Class I or II well pump installer certificate of
qualification
|
7(1)(b)
|
$697.50
|
21
|
Repairing pump with single-phase motor drive 1.5 HP or less
without Class I or II well pump installer certificate of
qualification
|
7(1)(c)
|
$697.50
|
22
|
Modifying pumping equipment for pump with single-phase motor
drive 1.5 HP or less without Class I or II well pump installer
certificate of qualification
|
7(1)(d)
|
$697.50
|
23
|
Modifying well during installation of pumping equipment for
pump with single-phase motor drive 1.5 HP or less without Class
I or II well pump installer certificate of qualification
|
7(1)(e)
|
$697.50
|
24
|
Failing to perform Class II well pump installer tasks in
accordance with Act, regulations or guidelines (specify)
|
7(6)
|
$697.50
|
25
|
Holding oneself out as Class I well pump installer without Class I
well pump installer certificate of qualification
|
8(1)(a)
|
$697.50
|
26
|
Installing pump with single-phase motor drive over 1.5 HP or
multi-phase motor drive (specify) without Class I well pump
installer certificate of qualification
|
8(1)(b)
|
$697.50
|
27
|
Repairing pump with single-phase motor drive over 1.5 HP or
multi-phase motor drive (specify) without Class I well pump
installer certificate of qualification
|
8(1)(c)
|
$697.50
|
28
|
Modifying pumping equipment for pump with single-phase motor
drive over 1.5 HP or multi-phase motor drive (specify) without
Class I well pump installer certificate of qualification
|
8(1)(d)
|
$697.50
|
29
|
Modifying well during installation of pumping equipment for
pump with single-phase motor drive over 1.5 HP or multi-phase
motor drive (specify) without Class I well pump installer
certificate of qualification
|
8(1)(e)
|
$697.50
|
30
|
Failing to perform Class I well pump installer tasks in accordance
with Act, regulations or guidelines (specify)
|
8(4)
|
$697.50
|
31
|
Failing to carry valid certificate of qualification while performing
task requiring certificate
|
13(1)
|
$467.50
|
32
|
Failing to present certificate of qualification on request to
inspector or property owner (specify) where certificate holder is
working
|
13(2)
|
$467.50
|
33
|
Failing to notify department in writing of change in address or
other information (specify) no later than 14 days after change
|
13(3)
|
$295.00
|
34
|
Constructing well in manner or location that could allow surface
water to enter well or aquifer
|
14(1)
|
$697.50
|
35
|
Failing to fill area surrounding well with clay or clean earth at
least 4.5 m in all directions from well
|
14(2)(a)
|
$467.50
|
36
|
Failing to grade area immediately surrounding well to elevation
at least 610 mm above highest surface water level
|
14(2)(b)
|
$467.50
|
37
|
Failing to locate and maintain well so it can be accessed
according to regulations (specify)
|
15
|
$467.50
|
38
|
Failing to construct well away from source of contamination to
prevent contamination of well
|
16(1)
|
$467.50
|
39
|
Constructing well closer than minimum distances from source of
contamination as set out in regulations (specify)
|
16(2)
|
$467.50
|
40
|
Constructing well in basement of building
|
17
|
$697.50
|
41
|
Failing to notify department of intent to drill, dig, construct,
repair or modify (specify) well no later than 24 hours before
work when requested
|
19(1)
|
$467.50
|
42
|
Failing to include all required information in notice required by
subsection 19(1)
|
19(2)
|
$295.00
|
43
|
Failing to notify department of intent to drill, dig or construct
(specify) well on lands owned or leased no later than 24 hours
before beginning work
|
19(3)
|
$467.50
|
44
|
Failing to include all required information in notice required by
subsection 19(3)
|
19(4)
|
$295.00
|
45
|
Constructing well so that it causes or may cause adverse effect
|
20
|
$697.50
|
46
|
Failing to install well casing in drilled well
|
21(1)
|
$697.50
|
47
|
Installing casing less than 6.1 m long in drilled well
|
21(2)(a)
|
$467.50
|
48
|
Installing casing that does not extend at least 152 mm above
ground in completed drilled well
|
21(2)(b)
|
$467.50
|
49
|
Installing casing or liner (specify) in drilled well with less than
25 mm of annular spacing
|
21(2)(c)
|
$467.50
|
50
|
Installing casing in drilled well without sealing to prevent leaking
from annular space, drive shoe or casing interface (specify)
|
21(2)(d)
|
$697.50
|
51
|
Installing steel well casing in drilled well without attaching and
sealing drive shoe (specify)
|
21(2)(e)
|
$697.50
|
52
|
Installing casing, liner or screen (specify) in drilled well without
sealing in accordance with regulations
|
21(2)(f)
|
$697.50
|
53
|
Installing liner to repair or modify drilled well without sealing in
accordance with regulations
|
21(2)(g)
|
$697.50
|
54
|
Installing casing, liner or screen (specify) in drilled well without
filling remaining volume of borehole in accordance with
regulations
|
21(2)(h)
|
$467.50
|
55
|
Installing casing in drilled well without welding or connecting to
well screen
|
21(2)(i)
|
$467.50
|
56
|
Installing screen in drilled well using filter pack contrary to
regulations
|
21(2)(j)
|
$467.50
|
57
|
Installing casing, liner or screen (specify) in drilled well using
additives containing toxic substances
|
21(2)(k)
|
$467.50
|
58
|
Constructing drilled well using water from supply other than as
prescribed by regulations (specify)
|
21(3)
|
$697.50
|
59
|
Failing to keep test records for non-registered drinking water
supply at registered address of well driller for 2 years
|
21(4)
|
$295.00
|
60
|
Failing to use well casing made of new material free of
contamination in drilled well
|
22(a)
|
$467.50
|
61
|
Failing to use well casing made of steel or thermoplastic in
drilled well
|
22(b)
|
$467.50
|
62
|
Failing to use well casing with minimum inside diameter of 152
mm in drilled well
|
22(c)
|
$467.50
|
63
|
Failing to use carbon steel well casing that conforms to standard
in drilled well
|
22(d)(i)
|
$467.50
|
64
|
Failing to use steel pipe well casing that conforms to standard in
drilled well
|
22(d)(ii)
|
$467.50
|
65
|
Failing to use casing with minimum wall thickness of 4.7 mm in
drilled well with steel well casing having inside diameter of 152
mm
|
22(e)
|
$467.50
|
66
|
Failing to use casing with minimum wall thickness of 7.1 mm and
conforming to standard (specify) in drilled well with
thermoplastic well casing having inside diameter of 152 mm
|
22(f)
|
$467.50
|
67
|
Failing to use casing with wall thickness that meets or exceeds
specification or standard (specify) in drilled well with
thermoplastic well casing having inside diameter exceeding 152
mm
|
22(g)
|
$467.50
|
68
|
Failing to use well liner made of new material and free of
contamination (specify) in drilled well
|
23(a)
|
$467.50
|
69
|
Failing to use well liner made of steel or thermoplastic in drilled
well
|
23(b)
|
$467.50
|
70
|
Failing to use well liner with minimum inside diameter of 102
mm in drilled well
|
23(c)
|
$467.50
|
71
|
Failing to use steel well liner that conforms to standard for
carbon steel well casing in drilled well
|
23(d)(i)
|
$467.50
|
72
|
Failing to use steel well liner that conforms to standard for steel
pipe in drilled well
|
23(d)(ii)
|
$467.50
|
73
|
Failing to use liner with minimum wall thickness of 3.6 mm in
drilled well with steel well liner having inside diameter of 102
mm
|
23(e)
|
$467.50
|
74
|
Failing to use liner with minimum wall thickness of 6.0 mm and
conforming to standard (specify) in drilled well with
thermoplastic well liner having inside diameter of 102 mm
|
23(f)
|
$467.50
|
75
|
Failing to use liner with wall thickness that meets or exceeds
specification or standard (specify) in drilled well with
thermoplastic well liner having inside diameter exceeding 102
mm
|
23(g)
|
$467.50
|
76
|
Failing to use well screen of proper design in drilled well
|
24(a)
|
$467.50
|
77
|
Failing to use well screen manufactured from material designed
for use in potable water supplies in drilled well
|
24(b)
|
$467.50
|
78
|
Failing to use well cap made of suitable material in drilled well
|
25(1)(a)
|
$467.50
|
79
|
Failing to use well cap fitted with gasket to prevent entry into
drilled well
|
25(1)(b)
|
$467.50
|
80
|
Failing to use vermin-proof well cap in drilled well
|
25(1)(c)
|
$467.50
|
81
|
Failing to use well cap with vent at least 12 mm in diameter
|
25(1)(d)(i)
|
$467.50
|
82
|
Failure to use well cap with vent that is shielded and screened to
prevent any substance from entering well
|
25(1)(d)(ii)
|
$467.50
|
83
|
Failing to use well cap with sealing device for power cables in
drilled well
|
25(1)(e)
|
$467.50
|
84
|
Failing to use well cap made of suitable material in flowing
drilled well
|
25(2)(a)
|
$467.50
|
85
|
Failing to use well cap fitted with gasket to prevent entry into
flowing drilled well
|
25(2)(b)
|
$697.50
|
86
|
Failing to use vermin-proof well cap in flowing drilled well
|
25(2)(c)
|
$467.50
|
87
|
Failing to install well casing in dug well
|
26(1)
|
$697.50
|
88
|
Constructing dug well with well casing less than 1.8 m long
|
26(2)(a)
|
$467.50
|
89
|
Constructing dug well with well casing less than 152 mm above
ground surface
|
26(2)(b)
|
$467.50
|
90
|
Failing to construct dug well with surface drainage away from
well head
|
26(2)(c)
|
$467.50
|
91
|
Failing to construct dug well with apron at least 152 mm thick
below the frost line but above water table
|
26(2)(d)(i)
|
$467.50
|
92
|
Failure to construct dug well with apron extending at least 914
mm from perimeter and with minimum slope of 21 mm/m
|
26(2)(d)(ii)
|
$467.50
|
93
|
Constructing dug well without filling remaining annular space in
accordance with regulations
|
26(2)(e)
|
$467.50
|
94
|
Failing to construct dug well with well joints that are water-tight
and sealed with suitable non-toxic sealer (specify) in accordance
with regulations
|
26(2)(f)
|
$467.50
|
95
|
Failing to construct dug well with annular space above apron
filled to ground surface to prevent entry in accordance with
regulations
|
26(2)(g)
|
$467.50
|
96
|
Failing to construct dug well with piping connections that are
water-tight and sealed with suitable non-toxic sealer (specify)
and in accordance with regulations
|
26(2)(h)
|
$467.50
|
97
|
Failing to construct dug well with piping excavations filled to
prevent surface water from entering well in accordance with
regulations
|
26(2)(i)
|
$467.50
|
98
|
Using additives containing toxic substances in dug well
|
26(2)(j)
|
$467.50
|
99
|
Constructing dug well using water from supply other than as
prescribed by regulations
|
26(3)
|
$467.50
|
100
|
Failing to keep test records for non-registered drinking water
supply at registered address of well digger for 2 years
|
26(4)
|
$295.00
|
101
|
Failing to use casing made of materials suitable for potable water
application in dug well with well casing made of precast concrete
rings with grooved joints
|
27(a)
|
$467.50
|
102
|
Failing to use casing that meets requirements of Section 22 in
dug well with steel or thermoplastic well casing
|
27(b)
|
$467.50
|
103
|
Failing to use filter pack material in dug well as prescribed by
regulations
|
28
|
$467.50
|
104
|
Failing to use sealing material for joints in dug well as prescribed
by regulations
|
29
|
$697.50
|
105
|
Failing to use material for apron used in dug well as prescribed
by regulations
|
30
|
$467.50
|
106
|
Failing to use well cap made of reinforced concrete at least 75
mm thick in dug well with concrete well casing
|
31(1)(a)
|
$467.50
|
107
|
Failing to use well cap that meets requirements of regulations in
dug well with steel or plastic casing
|
31(1)(b)
|
$467.50
|
108
|
Failing to use well cap made of suitable material in flowing dug
well
|
31(2)(a)
|
$467.50
|
109
|
Failing to use well cap fitted with gasket to prevent entry in
flowing dug well with steel or plastic casing
|
31(2)(b)
|
$697.50
|
110
|
Failing to use vermin-proof well cap in flowing dug well
|
31(2)(c)
|
$467.50
|
111
|
Failing to immediately remove and properly dispose of (specify)
all debris from in and around well when finished drilling,
digging, constructing, repairing or modifying well (specify)
|
32(a)
|
$467.50
|
112
|
Failing to immediately conduct yield test if required under
Section 33 when finished drilling, digging, constructing,
repairing or modifying well (specify)
|
32(b)
|
$295.00
|
113
|
Failing to immediately disinfect well when finished drilling,
digging, constructing, repairing or modifying well (specify)
|
32(c)
|
$697.50
|
114
|
Failing to immediately seal upper open end of casing with cap or
hand pump to prevent entry of substance when finished drilling,
digging, constructing, repairing or modifying well (specify)
|
32(d)
|
$697.50
|
115
|
Failing to immediately create mounded ground surface in
accordance with regulations (specify) when finished drilling,
digging, constructing, repairing or modifying well (specify)
|
32(e)
|
$467.50
|
116
|
Failing to immediately complete well construction record in
accordance with Section 46 (specify) when finished drilling,
digging, constructing, repairing or modifying well (specify)
|
32(f)
|
$295.00
|
117
|
Failing to perform yield test for new well before finishing
construction
|
33(1)(a)
|
$295.00
|
118
|
Failing to perform yield test for modified or repaired well before
finishing construction
|
33(1)(b)
|
$295.00
|
119
|
Failing to perform yield test in accordance with regulations
|
33(2)
|
$295.00
|
120
|
Failing to monitor and record for yield test in accordance with
regulations
|
33(3)
|
$295.00
|
121
|
Failing to meet regulations when repairing or modifying well to
prevent or stop adverse effect
|
34
|
$697.50
|
122
|
Failing to complete modification to satisfaction of inspector by
date specified in written notice
|
35(3)
|
$1157.50
|
123
|
Failing to notify department of intent to install pumping
equipment no later than 24 hours before beginning work when
requested by inspector or department
|
36(1)
|
$467.50
|
124
|
Failing to include all required information in notice
|
36(2)
|
$467.50
|
125
|
Failing to install, repair or modify (specify) pumping equipment
in accordance with Act
|
37(1)(a)
|
$697.50
|
126
|
Failing to install, repair or modify (specify) pumping equipment
in accordance with regulations
|
37(1)(b)
|
$697.50
|
127
|
Failing to install, repair or modify (specify) pumping equipment
in accordance with plumbing code
|
37(1)(c)
|
$697.50
|
128
|
Failing to install, repair or modify (specify) pumping equipment
in accordance with electrical code
|
37(1)(d)
|
$697.50
|
129
|
Failing to assess well in accordance with regulations (specify)
before pumping equipment is installed
|
37(2)
|
$467.50
|
130
|
Failing to install pumping equipment with diameter at least 25
mm smaller than diameter of borehole, casing and screen
(specify)
|
37(3)
|
$467.50
|
131
|
Failing to install hand pump in manner that seals casing or sleeve
(specify)
|
37(4)
|
$467.50
|
132
|
Failing to install sampling port or tap between pump and
treatment device
|
37(5)
|
$467.50
|
133
|
Failing to install pitless adaptor in new drilled well without hand
pump
|
38(1)
|
$467.50
|
134
|
Failing to install pitless adaptor so that different metals are not in
contact
|
38(2)
|
$467.50
|
135
|
Failing to create watertight seal in hole cut in casing for pitless
adaptor
|
38(3)
|
$697.50
|
136
|
Installing pitless adaptor that does not meet requirements of
regulations (specify)
|
38(4)
|
$467.50
|
137
|
Failing to use plastic pipe and fitting for installing pumping
equipment that conforms to specified standard
|
39
|
$467.50
|
138
|
Failing to immediately remove all debris from within and around
well after installing or repairing (specify) pumping equipment
|
40(a)
|
$467.50
|
139
|
Failing to immediately disinfect well after installing or repairing
(specify) pumping equipment
|
40(b)
|
$697.50
|
140
|
Failing to immediately seal upper open end of casing with cap or
hand pump to prevent entry after installing or repairing (specify)
pumping equipment
|
40(c)
|
$697.50
|
141
|
Failing to immediately complete pump installation record for
each pump installed as required by Section 48 after installing or
repairing (specify) pumping equipment
|
40(d)
|
$467.50
|
142
|
Failing to maintain well so that it does not cause adverse effect
|
42(1)
|
$697.50
|
143
|
Allowing substance (specify) that may cause adverse effect to be
placed in or to spill into well
|
42(2)
|
$697.50
|
144
|
Failing to ensure certificate holder installs well modifications,
grouting, pumping systems, packers or caps (specify) to stop and
control water flow from discharging immediately around well
head
|
43
|
$467.50
|
145
|
Failing to ensure well is capped in accordance with Section 25
and 31 and clause 32(1)(d) (specify)
|
44
|
$467.50
|
146
|
Failing to ensure well is immediately decommissioned by sealing
the well in accordance with guidelines
|
45(2)
|
$697.50
|
147
|
Failing to complete well decommissioning record as required in
Section 47 (specify)
|
45(3)
|
$467.50
|
148
|
Failing to complete well construction record with all required
information in accordance with regulations
|
46(1)
|
$295.00
|
149
|
Failing to sign well construction record
|
46(2)
|
$295.00
|
150
|
Failing to complete well decommissioning record with all
required information in accordance with regulations
|
47(1)
|
$295.00
|
151
|
Failing to sign well decommissioning record
|
47(2)
|
$295.00
|
152
|
Failing to complete pump installation record with all required
information in accordance with regulations
|
48(1)
|
$295.00
|
153
|
Failing to sign pump installation record
|
48(2)
|
$295.00
|
154
|
Failing to deliver copy of record (specify) to owner after well
construction, well decommissioning or pump installation
(specify) is completed
|
49(a)
|
$295.00
|
155
|
Failing to deliver copy of well construction, well
decommissioning or pump installation record (specify) to
department after completion on request or by January 31 of
calendar year following installation (specify)
|
49(b)
|
$295.00
|
156
|
Failing to keep copy of well construction, well decommissioning
or pump installation record (specify) for at least 2 years after date
of completion
|
49(c)
|
$295.00
|