News release

Weekly Traffic Advisories

Transportation and Infrastructure Renewal (Oct. 2007 - Feb. 2021)

NEW WORK


COLCHESTER COUNTY: Highway 102

Highway 102, from Brookfield to Truro, the northbound right lane will be closed for roadwork until Friday, Aug. 31.

Work takes place from dawn to dusk.


COLCHESTER COUNTY: Highway 104

Highway 104, westbound from East Mountain for about seven kilometres will have a right lane closure for roadwork until Friday, Aug. 31

Work takes place from dawn to dusk.


COLCHESTER COUNTY: Highway 104

Highway 104, eastbound from Onslow for about five kilometres will have a right lane closure for roadwork until Friday, Aug. 31

Work takes place from dawn to dusk.


QUEENS COUNTY: Highway 103, Herring Cove Brook Bridge

Herring Cove Brook Bridge, between Exits 18 and 19, Highway 103, has alternating lane closures for bridge repairs until Tuesday, July 31.

Temporary traffic lights are set up for 24 hours per day.


CONTINUING WORK


COLCHESTER COUNTY: Bible Hill

Vimy Road, Bible Hill, from College Road to Brookside Road, for about two kilometres is reduced to one lane for patching and paving until Friday, Aug.31.

Work takes place from daylight to dusk.


COLCHESTER COUNTY: Brookside

Farnham Mill Road, Brookside, from Route 311 to Brookside Road, is reduced to one lane for more than one kilometre for patching and paving until Friday, Aug. 31.

Work takes place from daylight to dusk.


COLCHESTER COUNTY: North River

Route 311 from Stewart's Bridge, in North River, for six kilometres north to Upper North River is reduced to one lane for patching and paving until Friday, Aug. 31.

Work takes place from daylight to dusk.


COLCHESTER COUNTY: Princeport

Riverside Road, Princeport, from Trunk 2 westerly, for about five kilometres, is reduced to one lane for patching and paving until Friday, Aug. 31.

Work takes place form daylight to dusk.


CUMBERLAND COUNTY: Nappan Marsh (Rainbow) Bridge, Trunk 2

Nappan Marsh (Rainbow) Bridge over the Nappan River on Trunk 2, outside Amherst, is closed until further notice.

A detour is available on Route 302, Southampton Road and Smith Road. Traffic approaching Amherst is being rerouted a short distance on the Nappan and Lower Porter Roads, while traffic leaving Amherst is required to detour on Smith Road.


DIGBY COUNTY: Cape St. Marys Bridge

Cape St. Marys Bridge, located on John Doucette Road, Cape St. Marys, is closed for bridge replacement until Thursday, Nov. 15.

Detour signs in place.


DIGBY COUNTY: Trunk 1, Meteghan River Bridge

Trunk 1, Meteghan River Bridge, Meteghan, to Highway 101 Connector, for about six kilometres has alternating lane closures for paving and patching until Friday, Aug. 31.

Personnel and signs will be on site. Work takes place from sunrise to sunset.


INVERNESS COUNTY: Judique

Trunk 19, from about one kilometre north of Joe Effie Road, northerly for about seven kilometres, is reduced to one lane for drainage improvements and repaving until Sunday, Sept. 30.

Traffic control persons and pilot vehicle are on site. Work takes place from 6 a.m. to 9 p.m.


KINGS COUNTY: Trunk 1

Trunk 1 from the Kentville Town Line to the Wolfville Town Line is reduced to one lane at night for paving. Work will take place between the hours of 9 p.m. to 7 a.m. until Friday, July 20. Residents in the area are advised that there may be an increased level of noise at night, during the construction hours.


LUNENBURG COUNTY: Highway 103, Camperdown

Highway 103, from Camperdown School Road to Camperdown Road, Camperdown, have alternating lane closures for paving until Friday, Aug. 31.

Traffic control will consist of stop and go traffic. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Parks Creek Bridge

Parks Creek Bridge on Route 332 is closed for bridge replacement until Wednesday, Oct. 31.

Motorists are required to detour via Route 332 to Indian Path Road and back to Route 332.


PICTOU COUNTY: Route 348, East River Road

Route 348, East River Road, is reduced to one lane in various sections from the Stellarton town line to the New Glasgow town line for repairs and repaving until Friday, Aug. 31.

Work takes place from sunrise to sunset.


PICTOU COUNTY: Route 348, Pictou Landing

Route 348, in Pictou Landing, is reduced to one lane from 500 metres east of Well Hill Road to Lewis Road for paving until Friday, Aug. 31.

Work takes place from 6:30 a.m. to 8:30 p.m., Monday to Friday. Traffic control personnel are on site. Motorists are advised to use extreme caution when travelling through a construction zone.


PICTOU COUNTY: Highway 104

Highway 104, westbound from about one kilometre east of Exit 24, Stellarton to Exit 21, Westville, about seven kilometres is reduced to one lane for road work until Friday, Aug. 31.

Traffic control on site. Work takes place from 6 a.m. to 9 p.m.


PICTOU COUNTY: Sutherlands River Bridge

Trunk 4 is closed in Sutherlands River, east of Church Road and west of the intersection of Route 245 and Thorburn Road, for the replacement of the Sutherlands River Bridge. Work is expected to continue until Sunday, Sept. 30.

A detour route and signs are in place. Motorists are advised to use extreme caution when travelling through a construction zone.


QUEENS COUNTY: Highway 103

Highway 103 near Liverpool between Exit 18 and Exit 19 has alternating lane closures for paving until Friday, Aug. 31.

Traffic control will consist of stop and go traffic. Work takes place from sunrise to sunset.


RICHMOND COUNTY: Port Royal Bridge

Port Royal Bridge on Port Royal Road on Isle Madame, is closed until further notice. Traffic can detour on MacEachern Road.


YARMOUTH COUNTY: Route 3, Pubnico

Route 3, Pubnico, from Ye Old Argyle Road to Route 335 has alternating lane closures for patching and repaving until Friday, Aug. 31.

Traffic control signs and personnel are in place. Work takes place from sunrise to sunset.