News release

Weekly Traffic Advisories

Transportation and Infrastructure Renewal (Oct. 2007 - Feb. 2021)

NEW WORK


ANNAPOLIS COUNTY: Trunk 10, Nictaux

Trunk 10, Nictaux, east to Bayard Road, will be closed for bridge repairs on Monday, Sept. 28, from 8:30 p.m. to 4 p.m.

Detour route will be set up with a barricade and signs.

Local Area Office: 902-825-3395
Fax: 902-825-2776


CUMBERLAND COUNTY: Route 310

Route 301 will be closed to through traffic between Mount Pleasant Road and Dickson Road to install culverts at Fitzsimmons Brook from Monday, Sept. 28, until Monday, Nov. 9.

Alternate routes and signs will be in place.

Local Area Office: 902-667-2972
Fax: 902-667-8294


INVERNESS COUNTY: Red River Road

Red River Road from the junction of Trunk 30 to the end, about 9.7 kilometres including roads off Red River Road: Pleasant Bay Harbour Road, Pleasant Bay United Church Road, Hinkley Glen Road and Angus More Road, will be reduced to one lane for bridge repairs and paving from Monday, Sept. 28, until Saturday, Oct. 31.

Traffic control people on site. Work takes place from 6:30 a.m. to 7:30 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


INVERNESS COUNTY: Trunk 30

Trunk 30, from Federal Park entrance at Pleasant Bay to the Federal Park entrance at MacKenzie Mountain, will be reduced to one lane for planing, patching and repaving from Monday, Sept. 28, until Saturday, Oct. 31.

Traffic control people on site. Work takes place from 6:30 a.m. to 7:30 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


CONTINUING WORK


ANNAPOLIS COUNTY: Highway 101

Sections of Highway 101 for 11.5 kilometres west of Exit 22 will be reduced to one lane for guardrail replacement, patching and paving until Wednesday, Sept. 30.

Work takes place from 7 a.m. to 4:30 p.m. each day.

Local Area Office: 902-825-7311
Fax: 902-825-3593


ANNAPOLIS COUNTY: Phinney Bridge on Route 201

Phinney Bridge on Route 201 will be closed for replacement until Thursday, Oct. 1.

A detour is available on Paradise Lane or Lawrencetown Lane to Trunk 1.

Local Area Office: 902-532-2844
Fax: 902-532-7092


ANTIGONISH COUNTY: Antigonish/Guysborough Road

Antigonish/Guysborough Road, off Route 316, will be restricted to local traffic to replace the wooden box culvert until Friday, Oct. 16.

A detour is available on Marydale Beauly Road.

Local Area Office: 902-863-3357
Fax: 902-232-2995


ANTIGONISH COUNTY: Highway 104

Highway 104, from Tracadie Harbour Bridge east for about 18 kilometres, will be reduced to one lane for cold planing, asphalt-concrete patching and repaving until Saturday, Oct. 31.

A pilot vehicle will be on site. Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-863-0364
Fax: 902-863-7482


ANTIGONISH COUNTY: Route 245

Route 245 will have alternating lane closures for almost eight kilometres west of the Antigonish town line for ditching, culvert installation and repaving until Wednesday, Sept. 30.

A detour is available on Old Maryvale Road. Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-863-0364
Fax: 902-863-7482


CAPE BRETON REGIONAL MUNICIPALITY: Alexandra Street Roundabout

Construction of the Alexandra Street roundabout at the intersection of Alexandra Street and Kenwood Drive in Sydney will continue until the end of October. The traffic lights will be replaced by a three-way stop during construction.

Drivers should expect delays or use an alternate route.

Local Area Office: 902-563-2518
Fax: 902-563-2517


CAPE BRETON REGIONAL MUNICIPALITY: Glace Bay Lake Bridge

Glace Bay Lake Bridge, Route 255, will be restricted to local traffic only to replace the bridge until Monday, Nov. 30.

A detour is available via Tower Road, Marconi Tower Road and Sand Lake Road.

Local Area Office: 902-577-2237
Fax: 902-563-2517


CAPE BRETON REGIONAL MUNICIPALITY: Keltic Drive

Keltic Drive from the railway tracks west for five kilometres will be reduced to one lane for repaving until Wednesday, Sept. 30.

Traffic control people and a pilot vehicle will be on site. A detour is available on Highway 125. Work takes place from 6 a.m. to 8 p.m.

Local Area Office: 902-563-2518
Fax: 902-563-2517


CAPE BRETON REGIONAL MUNICIPALITY: Route 223

Route 223 in Shunacadie will be closed for culvert replacement until Thursday, Oct. 8.

A detour is available via Route 216, Highway 4 and East Bay.

Local Area Office: 902-565-2747
Fax: 902-736-7914


CAPE BRETON REGIONAL MUNICIPALITY: Scotch Lake Road

Scotch Lake Road from Route 223, east for 7.5 kilometres, will be reduced to one lane for repaving until Wednesday, Sept. 30.

Traffic control people and a pilot vehicle are on site. A detour is available on Route 223. Work takes place from 6 a.m. to 8 p.m.

Local Area Office: 902-563-2518
Fax: 902-563-2517


CAPE BRETON REGIONAL MUNICIPALITY: Trunk 4

Trunk 4 near Ben Eoin will be reduced to one lane for gravelling, grading and paving until Sunday, Nov. 15.

Work takes place from 7 a.m. to 7 p.m. A pilot vehicle will guide drivers through the construction zone.

Local Area Office: 902-565-6841
Fax: 902-563-2517


COLCHESTER COUNTY: College Road

Sections of College Road in Bible Hill will be reduced to one lane from Main Street to Village Line Avenue for repaving until Friday, Oct. 30.

Traffic control people and signs are on site.

Local Area Office: 902-893-5797
Fax: 902-896-2259


COLCHESTER COUNTY: Corbett Bridge

Corbett Bridge on Brenton Crossroad will be closed for maintenance until Monday, Oct. 12.

Traffic control people and signs will be on site.

Local Area Office: 902-893-5780
Fax: 902-893-8175


COLCHESTER COUNTY: Highway 104

Highway 104 from Exit 17 westbound to Exit 15 will be reduced to one lane for widening and paving until Saturday, Oct. 31.

Work takes place from 7:30 a.m. to 7:30 p.m.

Local Area Office: 902-891-1573
Fax: 902-896-2259


COLCHESTER COUNTY: Stewarts Bridge

Stewarts Bridge located between Route 311 and West North River Road will be closed for replacement until Monday, Nov. 30.

A temporary panel bridge will be in place as a detour.

Local Area Office: 902-893-5797
Fax: 902-896-2259


COLCHESTER COUNTY: Trunk 2

Trunk 2 will be reduced to one lane for paving from the Cumberland County line to Soley Cove Road until Wednesday, Sept. 30.

Traffic control people and pilot vehicle on site. Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-896-7058
Fax: 902-896-2259


CUMBERLAND COUNTY: Trunk 2

Sections of Trunk 2 in the Halfway River area, between Lakelands Road and Boars Back Road, will be reduced to one lane until Friday, Oct. 30, for repaving.

Work will take place from 7 a.m. to 7 p.m. Drivers should use extra caution in the area.

Local Area Office: 902-667-6586
Fax: 902-667-3424


GUYSBOROUGH COUNTY: Trunk 7

Sections of Trunk 7 between Little Liscomb Road and Sherbrooke will be reduced to one lane until Friday, Oct. 30, for repaving.

Work will take place from 6:30 a.m. to 7:30 p.m. Motorists should use extra caution in the area.

Local Area Office: 902-533-2771
Fax: 902-533-4352


GUYSBOROUGH COUNTY: Melford Brook Bridge

The Melford Brook Bridge on Route 344 at Middle Melford is closed. A two-lane detour bridge will be available until a permanent bridge is completed.

The speed limit has been reduced to 60 km/h at the site and advance warning signs are in place.

Reduced weight restrictions are no longer in effect at this crossing.

Local Area Office: 902-533-2771
Fax: 902-533-4352


GUYSBOROUGH COUNTY: South River Lake Road

Sections of South River Lake Road, from three kilometres west of the North Ogden Road east for 6.4 kilometres, will be reduced to one lane for gravelling and repaving until Friday, Oct. 2.

Traffic control people and a pilot vehicle are on site. Work takes place from 6:30 a.m. to 7 p.m.

Local Area Office: 902-533-2771
Fax: 902-533-4352


GUYSBOROUGH COUNTY: Spanks Bridge

Spanks Bridge on the Larry's River Road at West Cooks Cove will be out of service (except to local traffic) for repairs until Saturday, Oct. 31.

A detour is available on Mountain Road and Trunk 16. Trans-Canada Trail users are advised that the Spanks Bridge is closed and to use caution when travelling in this area.

Local Area Office: 902-533-2771
Fax: 902-533-4352


HALIFAX REGIONAL MUNICIPALITY: Highway 102

Work on the Larry Uteck Interchange between exits 2 and 3 on Highway 102 will require frequent lane closures for blasting during construction.

Blasting times will be indicated by electronic signs. Drivers should use alternate routes when blasting is scheduled.

Local Area Office: 902-424-5591
Fax: 902-424-7116


HALIFAX REGIONAL MUNICIPALITY: Highway 102

Highway 102 from the merge point with Highway 118 for about five kilometres will be reduced to one lane until Saturday, Oct. 31, for paving.

Work takes place from sunrise to sunset, except on Fridays when it finishes by 3 p.m.

Local Area Office: 902-424-0054
Fax: 902-424-7116


HALIFAX REGIONAL MUNICIPALITY: Highway 103

Traffic on the westbound lanes of Highway 103 will be reduced to one lane at the Cranberry Bridge east of Exit 4 until Saturday, Oct. 3.

Drivers should reduce speed and use extra caution in the area.

Local Area Office: 902-832-4316
Fax: 902-832-4331


HANTS COUNTY: Highway 101

The westbound lanes of Highway 101 between Exit 7 in the Falmouth area and the Kings County line will be reduced to one lane until Wednesday, Sept. 30 for repaving.

A pilot vehicle will be on site. Drivers should expect delays or use Highway 1 between Exit 7 and Exit 8.

Local Area Office: 902-798-5957
Fax: 902-798-6747


HANTS COUNTY: Route 215

Whale Creek bridge on Route 215, about 300 metres west of William Conley Road, will be reduced to one lane until Wednesday, Sept. 30, to replace a cross culvert on the panel bridge.

Work will take place from sunrise to sunset.

Local Area Office: 902-883-9789
Fax: 902-883-8732


HANTS COUNTY: Sangsters Bridge

Sangsters Bridge, on Sangsters Bridge Road connecting Upper Falmouth and Trunk 14, will be closed for repairs until Wednesday, Sept. 30.

A detour route is available through the Town of Windsor.

Local Area Office: 902-798-5957
Fax: 902-798-6747


HANTS COUNTY: Trunk 2

Trunk 2 from Milford Road to about 150 metres south of Gibb Road will be reduced to one lane for paving until Saturday, Oct. 31.

Traffic control people on site. Work takes place from sunrise to sunset.

Local Area Office: 902-883-9789
Fax: 902-883-8732


HANTS COUNTY: Trunk 7

The westbound lanes of Highway 101 between Exit 7 in the Falmouth area and the Kings County line will be reduced to one lane until Wednesday, Sept. 30, for repaving.

A pilot vehicle will guide traffic through the construction area. Drivers should expect delays or use Highway 1 between Exit 7 and Exit 8.

Local Area Office: 902-798-5957
Fax: 902-798-6747


HANTS COUNTY: Wentworth Road/Morrison Drive and Highway 101

Wentworth Road/Morrison Drive and Highway 101 will have stop-and-go traffic for construction of a roundabout, sidewalk and water main until Monday, Nov. 3.

Work takes place from sunrise to sunset.

Local Area Office: 902-798-5957
Fax: 902-798-6747


INVERNESS COUNTY: Cabot Trail

Traffic on sections of the Cabot Trail in the Margaree Harbour-Margaree Forks area will be reduced to one lane for road shoulder repairs until Saturday, Oct. 31.

Signs and traffic control people are on site.

Local Area Office: 902-625-4200
Fax: 902-625-1946


INVERNESS COUNTY: Doyle's Bridge

Doyle's Bridge on the East Margaree Road will be closed until further notice. A detour is available on East Margaree Crossroad.

Local Area Office: 902-295-2700
Fax: 902-295-2617


INVERNESS COUNTY: Murrays Hill Bridge

Murrays Hill Bridge, which crosses the Mabou River near Rankinville Road, is closed until further notice.

Local Area Office: 902-625-4388
Fax: 902-625-4393


INVERNESS COUNTY: Route 252

Traffic on sections of Route 252, east of the intersection of East Skye Glen Cross Road, east for about 5.4 kilometres, will be reduced to one lane for repaving.

Work takes place until Saturday, Oct. 31. Traffic control people and signs on site.

Local Area Office: 902-625-4200
Fax: 902-625-1946


KINGS COUNTY: Kentville-Canning Area

Several roads in the Canning area will be reduced to one lane until Friday, Oct. 30, to allow for repaving. The roads are Route 358 from Belcher Street north to Route 341, Route 221 from Route 358 to Black Hill Road, Baines Road from Black Hill Road to J. Jordan Road, and Summer Street from J. Jordan Road to Chapel Street.

Work will take place from 7 a.m. to 8 p.m. Signs and traffic control people are on site. Drivers should expect delays and use extra caution in the area.

Local Area Office: 902-542-6344
Fax: 902-542-6342


KINGS COUNTY: Bridge Closure

The Busby McMahon Bridge on Brooklyn Street, near Aylesford, will be closed until further notice.

A marked detour route is available on New Road, Route 221 and Morden Road.

Local Area Office: 902-680-5914
Fax: 902-681-7151


KINGS COUNTY: Glebe Bridge

Glebe Bridge on Route 201 will have a 2.7-metre height restriction and a 15-tonne weight restriction until further notice.

Local Area Office: 902-538-3877
Fax: 902-538-8288


KINGS COUNTY: Hantsport

Kates Bridge on Tannery Road in Hantsport is closed for repairs until further notice.

A detour is available on Avon Street.

Local Area Office: 902-527-5448
Fax: 902-527-5371


KINGS COUNTY: Hillaton Road

Hillaton Road will be closed for bridge repairs until further notice.

A detour route is available from Route 221 to Route 358 to Saxon Street.

Local Area Office: 902-679-4308
Fax: 902-679-6124


KINGS COUNTY: Rainsforth Bridge

Rainsforth Bridge on Rainsforth Road will be closed for repairs until further notice.

A detour is in place.

Local Area Office: 902-538-3877
Fax: 902-538-8288


LUNENBURG COUNTY: LaHave Island Bridge

Traffic on the LaHave Island Bridge on Crescent Beach Road will be delayed during repairs until Wednesday, Sept. 30.

The bridge will remain open to traffic but delays of up to 20 minutes should be expected.

Work takes place on week days from 8 a.m. to 7 p.m.

Local Area Office: 902-527-5448
Fax: 902-527-5371


PICTOU COUNTY: Granton-Abercrombie Road

Granton-Abercrombie Road, from Trunk 4 north for about four kilometres to the railway crossing near the Michelin Plant, will be reduced to one lane for repaving until Wednesday, Sept. 30.

Traffic control people and a pilot vehicle are on site. Work takes place from 6:30 a.m. to 8:30 p.m.

Local Area Office: 902-752-6224
Fax: 902-755-7184


PICTOU COUNTY: Mount William Road

Mount William Road, from Highway 104 about five kilometres to Granton-Abercrombie Road, will be reduced to one lane for repaving until Wednesday, Sept. 30.

Traffic control people and a pilot vehicle are on site. Work takes place from 6:30 a.m. to 8:30 p.m.

Local Area Office: 902-752-6224
Fax: 902-755-7184


PICTOU COUNTY: Route 245

Route 245, for about five kilometres from Highway 104 east to Smith Road, will be reduced to one lane for repaving until Saturday, Oct. 31.

Traffic control people and pilot vehicle will be on site. Work takes place from 6:30 a.m. to 7:30 p.m.

Local Area Office: 902-752-6224
Fax: 902-755-7184


PICTOU COUNTY: Route 256

Route 256, from the Colchester county line east for about five kilometres, will be reduced to one lane for repaving until Saturday, Oct. 31.

Traffic control people and a pilot vehicle will be on site. Work takes place from 6:30 a.m. to 7:30 p.m.

Local Area Office: 902-752-6224
Fax: 902-755-7184


PICTOU COUNTY: Route 347, Sherbrooke Road

Route 347, from Falls Brook south to Meiklefield Road, for 4.4 kilometres will be reduced to one lane for repaving until Saturday, Oct. 31.

Traffic control people and pilot vehicle will be on site. Work takes place from 6:30 a.m. to 7:30 p.m.

Local Area Office: 902-752-6224
Fax: 902-755-7184


PICTOU COUNTY: Young Road

Highway 104 access on Young Road in Pine Tree will be closed until further notice for the Highway 104 twinning project.

The road remains open to local residents but has no exit.

Local Area Office: 902-755-7152
Fax: 902-755-7184


QUEENS COUNTY: Old Westfield Road

Old Westfield Road in Westfield will be closed for bridge replacement until Monday, Oct. 12.

A detour on Route 208 in South Brookfield and Trunk 8 to Westfield Road in Caledonia is available.

Local Area Office: 902-354-5035
Fax: 902-354-3106


RICHMOND COUNTY: Route 206

Route 206 from Creighton Road east to Veteran's Memorial Drive will be reduced to one lane for road repairs and paving until Saturday, Oct. 31.

Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


RICHMOND COUNTY: Trunk 4

Trunk 4 from Lakeshore Drive east for almost five kilometres will be reduced to one lane for road repairs and paving until Saturday, Oct. 31.

Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


RICHMOND COUNTY: Trunk 4

Trunk 4 from Lynches River Connector east to Chapel Island will be reduced to one lane for road repairs and paving until Saturday, Oct. 31.

Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


RICHMOND COUNTY: Bona Road

Bona Road, from Rocky Bay Road to Cap La Ronde Road in the Town of D'Escousse will be reduced to one lane for clearing, and repaving until Wednesday, Sept. 30.

Traffic control people are on site. Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


RICHMOND COUNTY: D'Escousse

Cap La Ronde Road in the Town of D'Escousse, from the intersection of Route 320 and Poirierville west for about five kilometres, will be reduced to one lane for clearing, and repaving until Wednesday, Sept. 30.

Traffic control people are on site. Work takes place from 7 a.m. to 7 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


RICHMOND COUNTY: Highway 104

Traffic on sections of Highway 104 east of Port Hawkesbury, between Exits 45 and 46, will be reduced to one lane for repaving until Wednesday, Sept. 30.

Traffic will be controlled by signs and traffic control people. Work is taking place between 7 a.m. and 7 p.m.

Local Area Office: 902-625-4200
Fax: 902-625-1946


VICTORIA COUNTY: Big Baddeck Road

Sections of Big Baddeck Road, north of Old Margaree Road, will be reduced to one lane until Wednesday, Sept. 30, for repaving.

A detour route is available on Old Margaree Road loop. Work takes place from 6 a.m. to 8 p.m.

Local Area Office: 902-674-2535
Fax: 902-674-2170


VICTORIA COUNTY: Corsen Bridge

Corsen Bridge, two kilometres before Ingonish, continues to be reduced to one lane.

Local Area Office: 902-295-2700
Fax: 902-295-2617


YARMOUTH COUNTY: Trunk 1

Trunk 1, from Prospect Street for about five kilometres to Lakeside Road, will be reduced to one lane for repaving and shoulder repairs until Saturday, Oct. 31.

Traffic delays are expected. Cyclists are asked to use caution as pavement is grooved. Work takes place from sunrise to sunset.

Local Area Office: 902-742-0587
Fax: 902-742-6000


YARMOUTH COUNTY: Raynardton Road

Raynardton Road, from the intersection with Trunk 3 north for about 3.5 kilometres, will be reduced to one lane for ditching, culvert replacement and paving until Saturday, Oct. 31.

Local Area Office: 902-742-0287
Fax: 902-742-6000