News release

Weekly Traffic Advisories

Transportation and Infrastructure Renewal (Oct. 2007 - Feb. 2021)

NEW WORK


INVERNESS COUNTY: Cheticamp River Bridge

Cheticamp River Bridge on the Cabot Trail will be reduced to one lane for bridge replacement until Sunday, Oct. 31.

Local Area Office: 902-625-4200


KINGS COUNTY: Glebe Bridge

Glebe Bridge on Route 210 located between Trunk 1 and Ward Road will be closed to traffic on Sunday, May 23 between 6 a.m. and 10 a.m. for bridge maintenance.

Detour route via Trunk 1 to Victoria Road then to Ward Road.

Local Area Office: 902-679-4979


CONTINUING WORK


ANNAPOLIS COUNTY: Highway 101

Highway 101, west of Exit 22 for about nine kilometres, will be reduced to one lane for guardrail replacement, patching and paving until Saturday, July 31.

Work takes place from 6:30 a.m. to 8:30 p.m.

Local Area Office: 902-825-7311


CAPE BRETON REGIONAL MUNICIPALITY: Sydney River Bridge

Repairs to the Sydney River Bridge on Keltic Drive are expected to continue until the end of June.

Traffic on the bridge will continue to be one lane until repairs are completed.

Residents of Coxheath and Westmount are encouraged to use the interchange on Coxheath Road to get to Highway 125 during the construction period.

Local Area Office: 902-563-2245


COLCHESTER COUNTY: Highway 104

Highway 104, from Exit 15 westbound to Exit 13 will be reduced to one lane for shaping and paving of crossovers until Saturday, July 31.

Work takes place from 7:30 a.m. to 7:30 p.m.

Local Area Office: 902-890-1573


COLCHESTER COUNTY: Trunk 2 and Plains Road

Trunk 2 (Belmont Road to Putnam Road) will be reduced to one lane for cold planing , gravelling and paving until Tuesday, June 15.

Plains Road (McElmond Road to Belmont Road) will be reduced to one lane for ditching, culvert replacements, patching and repaving until Tuesday, June 15.

Work takes place from sunrise to sunset.

Local Area Office: 902-843-5785


CUMBERLAND COUNTY: Northport Bridge

Northport Bridge on Route 366 is closed until further notice for replacement.

Detour from Shinimicas Road to the east of the bridge and Mudcreek Road to the west of the bridge. Cyclists should travel with caution.

Local Area Office: 902-667-2972


CUMBERLAND COUNTY: Trunk 2

The weight restriction for trucks on Trunk 2, Springhill Junction, will be reduced to 20 tonnes for CNR mainline repairs until Monday, May 31.

Local Area Office: 902-667-8294


DIGBY COUNTY: Highway 101

Highway 101, from Exit 31 to Exit 32 will be reduced to one lane for repaving and shoulder work until Thursday, July 15.

Traffic delays are expected. Cyclists are asked to use caution. Work takes place from sunrise to sunset.

Local Area Office: 902-742-0587


GUYSBOROUGH COUNTY: Melford Brook Bridge

The Melford Brook Bridge on Route 344 at Middle Melford is closed. A two-lane detour bridge is in place until a permanent bridge is built.

The speed limit has been reduced to 60 km/h and warning signs are in place.

Local Area Office: 902-533-2771


HALIFAX REGIONAL MUNICIPALITY: Highway 102, Larry Uteck Interchange

Detour ramps are open for traffic on Highway 102 (Bicentennial Highway) at the Larry Uteck Interchange.

The detour provides two lanes in each direction around the construction site. Speed limit on the detour is 80 km/h.

Local Area Office: 902-424-5591


HALIFAX REGIONAL MUNICIPALITY: Highway 111

Highway 111 for about 500 metres below the Highfield-Burnside Driver Overpass, will have single lane closures in each direction for paving until Monday May 24.

Work takes place from 9 a.m. to 6 p.m. Monday to Saturday.

Local Area Office: 902-424-0054


HANTS COUNTY: Highway 101, Wentworth Road

Highway 101, from Exit 5 to Exit 5A (Wentworth Road Overpass included), will be reduced to one lane, stop-and-go traffic, for cold planing and repaving until Saturday, July 31.

The Wentworth Underpass will also have stop-and-go traffic for concrete repairs for the same time period.

Traffic control people are on site. Work takes place from sunrise to sunset.

Local Area Office: 902-798-5957


HANTS COUNTY: Route 236

Route 254 in Kennetcook to Route 236 Northfield Road will be reduced to one lane for about 7.5 kilometres for paving until Thursday, Sept. 30.

Traffic control persons will be on site. Work takes place from sunrise to sunset.

Local Area Office: 902-883-9789


HANTS COUNTY: Trunk 2/Mill Village Road

Trunk 2 from Gibb Road to 244 Interchange, about 2 kilometres, will be reduced to one lane for paving until Saturday, July 31.

Traffic control persons will be on site. Work takes place from sunrise to sunset.

Local Area Office: 902-883-9789


INVERNESS COUNTY: Murrays Hill Bridge

Murrays Hill Bridge, which crosses the Mabou River near Rankinville Road, is closed until further notice.

Local Area Office: 902-625-4388


KINGS COUNTY: Bridge Closure

The Busby McMahon Bridge on Brooklyn Street, near Aylesford, is open to one lane until further notice. Traffic lights are in place.

Local Area Office: 902-679-4979


KINGS COUNTY: Hantsport

Kates Bridge, on Tannery Road in Hantsport, is closed for repairs until further notice.

A detour is available on Avon Street.

Local Area Office: 902-527-5448


LUNENBURG COUNTY: Highway 103

Highway 103 between Exit 8 and Exit 9 will be reduced to one lane for cold planing, widening of the twinned sections and paving until mid-June.

Work takes place from sunrise to sunset.

Local Area Office: 902-541-5603.


PICTOU COUNTY: Highway 104, Exit 24

North Foord Street, south of the Trans Canada Highway by the ramps, will be restricted to a single lane until Tuesday, Aug. 31 to allow for construction of a roundabout at the intersection of Foord Street and Exit 24. The first phase of work consists of replacement of sanitary sewer and installation of catch basin.

Traffic control will be on site. Expect delays and use an alternate route.

Local Area Office: 902-752-2946


PICTOU COUNTY: Highway 106

A 7.2 kilometre section of Highway 106, from Highway 104 north to Exit 2, including westbound Ramps on Highway 104 and ramps at Exit 1A and Exit 2 on Highway 106, will be reduced to one lane for cold planing, installation of rumble strips, patching and repaving until Saturday, July 31.

Traffic delays are expected and motorists should use caution when traveling through the construction zone.

Work takes place from 6:30 a.m. to 7:30 p.m. Monday to Thursday and from 6:30 a.m. to 3 p.m. on Fridays.

Local Area Office: 902-752-6224


VICTORIA COUNTY: Corsen Bridge

Corsen Bridge, two kilometres before Ingonish, continues to be reduced to one lane.

Local Area Office: 902-295-2700


VICTORIA COUNTY: Highway 105

Seven sections of Highway 105 between Exit 6 and Exit 8 are reduced to one lane for construction and repaving. It is estimated the work will last until Saturday, July 31.

Traffic control people are on site. Work takes place from sunrise to sunset.

Local Area Office: 902-674-2146