Weekly Traffic Advisories
CAPE BRETON REGIONAL MUNICIPALITY: Sydney-Glace Bay Highway – Reserve Street/Wilson Road
Roadwork is taking place, in two sections, on the Sydney-Glace Bay Highway and will continue until Saturday, Oct. 31.
Section 1: Reserve Street/Trunk 4, 600 metres east of Old Airport Road to 260 metres east of Haulage Road will be reduced to one lane.
Section 2: Wilson Road/Trunk 4 to Dominion Street, at the old Glace Bay town line, will be reduced to one lane. Traffic control is on site. Work takes place from 7 a.m. to 5 p.m.
HANTS COUNTY: McKay Road, Newport
McKay Road, from 2.6 kilometres west of Clayton McKay Road to Woodville Road, will be reduced to one lane for paving from Monday, Sept. 28 until Monday, Nov. 30.
Work takes place from sunrise to sunset.
PICTOU COUNTY: Minto Road
Minto Road will be closed between Scotsburn Road and Civic 111 to carry out bridge repairs until Oct. 9. A signed detour will be in place.
CONTINUING WORK
ANNAPOLIS COUNTY: Brickton Bridge, Brickton
Brickton Bridge on Mount Hanley Road is closed for repairs until Friday, Dec.18. Detour is in place.
ANTIGONISH COUNTY: East Havre Boucher Underpass, Highway 104
East Havre Boucher underpass, Highway 104, has alternating lane closures until Wednesday, Sept. 30 for bridge repairs. Traffic signals are in place.
ANTIGONISH COUNTY: Trunk 4
Trunk 4, Antigonish County, from South River Road to Beech Hill Road, is closed until further notice. The closure will be in effect until permanent upgrades are made to the Beech Hill/Trunk 4 intersection.
A detour is available via South River Road and Beech Hill Road.
COLCHESTER COUNTY: Highway 102 Southbound
Highway 102 southbound is reduced to one lane of traffic between Highway 104 to Exit 13 from 8 p.m. to 7 a.m. until Wednesday, Sept. 30.
COLCHESTER COUNTY: Trunk 4, Lower Debert River Bridge
Trunk 4, at Lower Debert River Bridge, is closed for bridge replacement until Saturday, Oct. 31.
A detour is available via Highway 104 between Exits 11 and 12.
GUYSBOROUGH COUNTY: North River Brook Bridge, Larrys River
North River Brook Bridge on Cole Harbour Road in Larrys River is closed to all traffic until further notice. Detour is in place.
HALIFAX REGIONAL MUNICIPALITY: Bedford Bypass
A repaving and guardrail project is taking place on the Bedford Bypass westbound lanes, from the exit to Dartmouth Road to the overpass near the intersection of Highway 101.
Repairs will also be carried out to the structures over Memory Lane, Rocky Lake Drive and Highway 102 from 7 p.m. to 3 p.m. Motorists should expect delays.
A detour will be in place for traffic bound for Highway 101.
Traffic will be rerouted to Cobequid Road, Glendale Avenue, Highway 102 and Highway 101.
The work is expected to be completed by Wednesday, Sept. 30.
HALIFAX REGIONAL MUNICIPALITY: Dillmans Bridge, Meaghers Grant
Dillmans Bridge, on Wyse Road in Meaghers Grant, will be closed until further notice. A detour is available via Old Guysborough Road. Signs are in place.
HANTS COUNTY: Highway 102, Lantz
A temporary detour is in place on Highway 102 north of Exit 8, Elmsdale, for the replacement of the Nine Mile River bridges, northbound and southbound. This work is part of ongoing construction for the new Lantz Interchange and Connector Road.
The detour has a reduced speed limit of 80 kilometres an hour and is expected to be in place until mid-summer 2021.
The Lantz Interchange and Connector Road is expected to be complete and open to traffic by fall 2021.
HANTS COUNTY: Hydes Bridge
Hydes Bridge in Lantz, on Highway 277, will be closed until further notice.
A detour is in place via Dutch Settlement Road, Elmsdale Road and Trunk 2. Signs are in place.
HANTS COUNTY: South Maitland Bridge
South Maitland Bridge on Route 236 is reduced to one lane for bridge repairs until Tuesday, Nov. 17. Signal lights will be in place.
INVERNESS COUNTY: Highway 105/Route 252, Whycocomagh
The intersection of Highway 105 and Route 252, Whycocomagh, is reduced to one lane until Monday, Nov. 30. Work takes place from 7 a.m. to 7 p.m.
KINGS COUNTY: Bear Brook Bridge, Berwick
Bear Brook Bridge, on Russia Road in Berwick, is closed for repairs until further notice. A detour is in place.
KINGS COUNTY: Highway 101, Morden Road Overpass
The Morden Road overpass on Highway 101, near Aylesford, is reduced to one lane for repaving until Thursday, Oct. 15. Work takes place from sunrise to sunset.
KINGS COUNTY: Jehill Bridge, Jehill Davidson Road, Newtonville
Jehill Bridge, on Jehill Davidson Road, Newtonville is closed for repairs until Friday, Oct. 16. Detour is in place.
LUNENBURG COUNTY: Frank Swinamer Road, Chester Basin
Frank Swinamer Road, Chester Basin, from North Street to Trunk 3, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: MacCulloch Road, Bridgewater
MacCulloch Road, Bridgewater has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Lawrence Hatt Road, Chester Basin
Lawrence Hatt Road, Chester Basin, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Regent Street, Chester
Regent Street, Chester, from Central Street to Brunswick, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Gail Avenue, Bridgewater
Gail Avenue, Bridgewater, from Lower Branch Road to Johanne Drive, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Duke Street, Bridgewater
Duke Street, Bridgewater, from Queen Street to Trunk 3, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Harold Whynot Road, Bridgewater
Harold Whynot Road, Bridgewater, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: River Lane, Pleasantville
River Lane, Pleasantville, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Fire Hall Road, New Germany
Fire Hall Road, New Germany, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Tremont Road, Chester
Tremont Road, Chester, from King Street to Valley Road, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Union Street, Chester
Union Street, Chester, from King Street to Duke Street, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Delong Lane, New Germany
Delong Lane, New Germany, from Barss Corner Road, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: William Hebb Road, Bridgewater
William Hebb Road, Bridgewater, has alternating lane closures for paving Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Jubilee Road, Bridgewater
Jubilee Road, Bridgewater, from Trunk 3 to Bridgewater town line, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Chandler Road, Chester
Chandler Road, Chester, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Route 332, Riverport
Route 332, Riverport, from Trunk 3 to Riverport Bridge, has alternating lane closures for paving until Friday, Nov. 27.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Pine Street, Bridgewater
Pine Street, Bridgewater, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Maple Street, Bridgewater
Maple Street, Bridgewater, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Pernette Drive, West LaHave
Pernette Drive, West LaHave, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Nauss Point Road, Chester
Nauss Point Road, Chester, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Cove Road, Conquerall Bank
Cove Road, Conquerall Bank, from Conquerall Road to Route 331, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Prince Street, Bridgewater
Prince Street, Bridgewater, from Pleasant Street to Main Street, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Chester Shore Road, Chester
Chester Shore Road, Chester, from Pig Loop Road to Trunk 3, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Dawson Heights, Pine Grove
Dawson Heights, Pine Grove, from Pine Grove Road to Lohnes Drive, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Charlie Lane, Pine Grove
Charlie Lane, Pine Grove, from Pine Grove Road to Lohnes Drive, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Levi Hebb Road, Bridgewater
Levi Hebb Road, Bridgewater, from Birch Street to Cedar Street, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Pear Street, Bridgewater
Pear Street, Bridgewater, from Route 235 to Bridgewater Town Line, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Cedar Street, Bridgewater
Cedar Street, Bridgewater, from Pine Street to Maple Street, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Main Street, Bridgewater
Main Street, Bridgewater, from Valley Road to Queen Street, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Beech Street, Bridgewater
Beech Street, Bridgewater, from Pine Street to Maple Street, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Darius Wile Road, Wileville
Darius Wile Road, Wileville, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Delong Lane, New Germany
Delong Lane, New Germany, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Bell Avenue, Hebbville
Bell Avenue, Hebbville, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Hillside Drive, Bridgewater
Hillside Drive, Bridgewater, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Lohnes Drive, Bridgewater
Lohnes Drive, Bridgewater, from Charlie Lane to Dawson Heights, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
LUNENBURG COUNTY: Birch Street, Bridgewater
Birch Street, Bridgewater, from Maple Street to Old Trunk 3, has alternating lane closures for paving until Monday, Nov. 30.
Traffic is stop and go. Work takes place from sunrise to sunset.
RICHMOND COUNTY: Black River Road
Black River Road, from Trunk 4, northerly for about five kilometres, will have alternating lane closures for repaving until Wednesday, Sept. 30.
Work takes place from sunrise to sunset. Traffic control people are on site.
RICHMOND COUNTY: Port Royal Bridge
Port Royal Bridge, Port Royal Road on Isle Madame, is closed until further notice. A detour is in place on MacEachern Road.
SHELBURNE COUNTY: Highway 103
Highway 103, near Sable River Station to Exit 23, is reduced to one lane traffic, from sunrise to sunset. Lane closures will alternate until Oct. 30. Expect delays.
VICTORIA COUNTY: Gillis Point Road
Gillis Point Road, from one kilometre south of Washabuck Road, for almost three kilometres, will have alternating lane closures for repaving until Wednesday, Sept. 30.
Work takes place from sunrise to sunset. Traffic control people are on site.