Adobe Forms
Please note, due to the interactive nature of the forms listed below, some browsers and older versions of Adobe may not open the files correctly. If this occurs, please save the link as a pdf document first, and then open using the latest version of Adobe Reader.
Updated Contaminated Sites Environmental Quality Standards (October 2022):
All Notifications under the Contaminated Sites Regulations and any 30-Day Cleanups initiated after October 10, 2022 must follow the updated criteria.
Notifications made after Sept 30, 2021 which have not been closed prior to October 10, 2022, must use the updated version (October 2022) for closure.
- Notice of Amendments – 2022 (PDF:113k)
Implementation of Amendments to the Contaminated Sites Protocols (September 2021):
Amendments have been made to the Notification of Contamination, Remediation Levels, and Confirmation of Remediation Protocols. These amendments will be effective on and after September 30, 2021. The updates to the Environmental Quality Standards (EQS) and Pathway Specific Standards (PSS) tables will take effect in the following manner:
- All Notifications under the Contaminated Sites Regulations made after September 30, 2021 or any 30-Day Cleanups initiated after September 30, 2021 must follow the amended criteria.
- Any Notifications under the Contaminated Sites Regulations filed with the Department prior to September 30, 2021 may choose to follow the amended criteria or continue to use previous criteria (archived, 2013) until September 30, 2023.
- Any 30-Day Cleanups initiated prior to September 30, 2021 may choose to follow the amended criteria or continue to use previous criteria for up to 90 days (December 30, 2021).
- Once file closure documentation is submitted, if more work is required, the applicable deadline dates for transition files outlined above (September 30, 2023 and December 30, 2021) still apply. If additional work is required beyond the deadline dates for transition files, the amended EQS and PSS criteria (2021) would now apply.
- If time extensions to close a file extend beyond the deadline dates outlined above, the amended EQS and PSS criteria (2021) would apply.
- Notice of Amendments – 2021 (PDF:174k)
- Implementation of Amendments - 2021 (PDF:163k)
Notification of Contamination Protocol
PRO-100 - Notification of Contamination Protocol (PDF:651k)
[Revised: October 2022]
- FRM-100 Notification of Free Product or Contamination Form (PDF:1.4mb)
[Revised: October 30, 2019] - FRM-101 Verification for 30-Day Clean-Up Exemption Form (PDF:2mb)
[Revised: September 2021] - Table 1A Tier 1 EQS for Soil at a Potable Site (PDF:227k)
[Revised: October 2022] - Table 1B Tier 1 EQS for Soil at a Non-Potable Site (PDF:229k)
[Revised: October 2022] - Table 2 Tier 1 EQS for Sediment (PDF:157k)
[Revised: October 2022] - Table 3 Tier 1 EQS for Surface Water (PDF:936k)
[Revised: September 2021] - Table 4A Tier 1 EQS for Groundwater at a Potable Site (PDF:218k)
[Revised: October 2022] - Table 4B Tier 1 EQS for Groundwater at Non-Potable Site (PDF:214k)
[Revised: October 2022] - Table 5 Substances Potentially Considered as Background Occurrences (PDF:575k)
[Revised: September 2021]
Environmental Site Assessment for Limited Remediation Protocol
PRO-200 - Environmental Site Assessment for Limited Remediation Protocol (PDF:634k)
- CHK-200 Environmental Site Assessment for Limited Remediation Checklist (PDF:435k)
[Revised: October 30, 2019]
Phase 1 Environmental Site Assessment Protocol
PRO-300 - Phase 1 Environmental Site Assessment Protocol (PDF:687k)
- CHK-300 Phase 1 Environmental Site Assessment Checklist (PDF:403k)
[Revised: October 30, 2019]
Phase 2 Environmental Site Assessment Protocol
PRO-400 - Phase 2 Environmental Site Assessment Protocol (PDF:603k)
- CHK-400 Phase 2 Environmental Site Assessment Checklist (PDF:384k)
[Revised: October 30, 2019] - FRM-400 Request for Time Extension Form (PDF:312k)
[Revised: October 30, 2019]
Remediation Levels Protocol
PRO-500 - Remediation Levels Protocol (PDF:801k)
[October 2022]
- Table 1 Tier 2 Pathway Specific Standards – Exposure Pathway Removal Effects (PDF:372k)
[September 2021] - Table 2 Tier 2 Site Specific Risk Assessment Modelling: Changes to Typical Default Data Parameters (PDF:935k)
[September 2021] - Table 3A Pathway Specific Standards for Agricultural Soil (PDF:888k)
[September 2021] - Table 3B Pathway Specific Standards for Residential Soil (PDF:940k)
[September 2021] - Table 3C Pathway Specific Standards for Commercial Soil (PDF:891k)
[September 2021] - Table 3D Pathway Specific Standards for Industrial Soil (PDF:891k)
[September 2021] - Table 4 Pathway Specific Standards for Freshwater and Marine Sediment (PDF:884k)
[September 2021] - Table 5 Pathway Specific Standards for Ecological Surface Water and Groundwater - Freshwater and Marine (PDF:868k)
[September 2021] - Table 6A Pathway Specific Standards for Agricultural Groundwater (PDF:177k)
[Revised: October 2022] - Table 6B Pathway Specific Standards for Residential Groundwater (PDF:178k)
[Revised: October 2022] - Table 6C Pathway Specific Standards for Commercial Groundwater (PDF:177k)
[Revised: October 2022] - Table 6D Pathway Specific Standards for Industrial Groundwater (PDF:176k)
[Revised: October 2022]
Remedial Action Plan Protocol
PRO-600 - Remedial Action Plan Protocol (PDF:505k)
- CHK-600 Remedial Action Plan Checklist (PDF:419k)
[Revised: October 30, 2019] - FRM-600 Third Party Denial Access Form (PDF:1.5mb)
[Revised: October 30, 2019]
Confirmation of Remediation Protocol
PRO-700 - Confirmation of Remediation Protocol (PDF:645k)
- CHK-700 Confirmation of Remediation Checklist (PDF:2mb)
[Revised: September, 2021] - FRM-700 Record of Site Condition Form (PDF:1.9mb)
[Revised: October 30, 2019] - FRM-701 Declaration of Property Condition Form (PDF:1.8mb)
[Revised: October 30, 2019]
Archive Files
Protocols
Documents
Administration / Guidance
- Administrative Fee Fact Sheet (under review)
Atlantic RBCA
- Atlantic RBCA EQS Rationale and Guidance (PDF:727k)
[July 2021, updated July 2022] - Atlantic RBCA Website